Inspections for the day of: Tuesday, March 3, 2020.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00589 General Inspection3/3/20203/3/20203/4/2020 1:58:45 PM PASS
Hillside along cartwright still needs to be stabalized.
ESC19-00601 General Inspection3/3/20203/3/20203/4/2020 1:54:30 PM PASS
Lot hydroseeded, no growth.
ESC18-01677 Aging Inspection3/3/20203/3/20203/4/2020 10:11:08 AM PASS
Garage completed, no landscaping.
ESC18-01121 General Inspection3/3/20203/3/20203/3/2020 2:31:14 PM PASS
Good vegetation and stabalization around main river channel.
Pathway along ponds is pit run along sides, no regrowth.
ESC18-01454 Aging Inspection3/3/20203/3/20203/3/2020 2:00:35 PM CANC
ESC18-01454 DOC - Permit Finaled3/3/20203/3/20203/3/2020 2:00:28 PMPPASS
ESC18-01711 Aging Inspection3/3/20203/3/20203/3/2020 1:51:56 PM CANC
ESC18-01711 DOC - Permit Finaled3/3/20203/3/20203/3/2020 1:51:49 PMPPASS
ESC19-00581 General Inspection3/3/20203/3/20203/3/2020 12:31:21 PM PASS
ESC15-01210 General Inspection3/3/20203/3/20203/3/2020 12:27:38 PM PART
2 vacant lots that have some runoff going onto sidewalks.
2 homes under construction with unstabalized lots, no issues with either.
ESC19-00584 General Inspection3/3/20203/3/20203/3/2020 12:08:25 PMPPASS
Discharge is 0.62 NTU.
Two well points in east pond on east side.
Will begin excavating this afternoon, waiting on flaggers for Warm Springs. West pond down to starting grade. WIP on installing storm water bypass line along greenbelt, want to gewt it installed before any water needs to be pumped into pond. Some dewatering for install, going into pond, not being discharged, very little flow.
Currently doing some work on north of warm springs. Grubbing on west and hauling to east for fill. Plan on using west for fill brought from pond. Some dust on one section of haul road.
Talked with Rex while on site.
ESC18-00177 General Inspection3/3/20203/3/20203/3/2020 11:19:06 AMPPASS
All foundations, roads, sidewalks and curbing completed. No framing in site, all work is on perimeter homes and 4-plexes. No trash blown into creek, site is clean.
ESC19-01070 General Inspection3/3/20203/3/20203/3/2020 11:17:46 AMPPASS
WIP on framing.
ESC19-00271 Aging Inspection3/3/20203/3/20203/3/2020 11:00:18 AM PASS
Work is in back yard. Front is landscaped, area contained.
ESC19-01545 General Inspection3/3/20203/3/20203/3/2020 10:52:01 AMPPASS
All current work inside. Outside has been prepped for stucco, hasn't begun yet.
ESC20-00139 General Inspection3/3/20203/3/20203/3/2020 10:51:23 AMPFAIL
Foundation work, has been poured. Site itself is clean.
Ecopan is overflowing,located down common drive off parcel, rp notified. Over filled washout is reason for fail.
ESC19-00245 General Inspection3/3/20203/3/20203/3/2020 10:29:10 AMPPASS
Entire area has been hydroseeded. No growth, no activity.
ESC18-01089 General Inspection3/3/20203/3/20203/3/2020 10:15:48 AM PART
Foxgrove has been cleaned up. Still some dirty areas of street and sidewalk, no backfill or materials stored on roads or sidewalk.
Crew with trash trailer at site, they are cleaning trash that has blown off of work sites.
Some tracking up Trapper, no large chunks, more staining from red dirt. A few landscape crews on site.
Overall site isn't to bad, just needs a cleaning.
ESC18-01586 Aging Inspection3/3/20203/3/20203/3/2020 9:32:04 AM PASS
Area for basement excavated. A few form trailers on site, no concrete activity, site looks idle. House is still up on blocks.
ESC18-01227 BMP Violation2/27/20203/3/20203/2/2020 9:49:52 AMAPASS
Small trash picked up. Still lots of buyilding waster, will need to stay on trash cleanup. Nothing in park.