ESC19-00371
| General Inspection | 3/30/2020 | 3/31/2020 | 4/1/2020 10:01:43 AM | P | PASS |
|
|
No wate rin vortex pond or above dam. L2 is on site at bottom of road working on sewer. Few trenched dug, extra boxes and chips on site. Gras is starting to grow on hillsides. Concrete crew on top installing sidewalks and curbing. Sidewalks LLC is contractor, Knife River is bringing mud. Did not see any concrete washout or dumped washout at site. No ESC issues
|
ESC17-00791
| General Inspection | 3/31/2020 | 3/31/2020 | 4/1/2020 9:29:32 AM | | PASS |
|
|
No activity
|
ESC19-00770
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 1:12:37 PM | | PASS |
|
|
Home has gutters, no rilling on lot. Some rills on bare area along common drive, no issues.
|
ESC19-00806
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 1:04:14 PM | | PASS |
|
|
Home is framed and tyvek wrapped. Site is clean and contained.
|
ESC20-00293
| Site Preparation | 3/30/2020 | 3/31/2020 | 3/31/2020 1:02:51 PM | P | PASS |
|
|
Perimeter wattles installed. Excavation has begun, all backfill contained on site, pile is close to sidewalk, none getting on it. Installed permit while at site.
|
ESC20-00264
| Complaint Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 12:33:09 PM | P | PASS |
|
|
No issues with hillside. All water absorbed, no ruts or rills. No dirt leaving out bottom of site.
|
ESC19-01341
| BMP Violation | 3/31/2020 | 3/31/2020 | 3/31/2020 12:32:34 PM | P | FAIL |
|
|
Washout dumped, leaving site. Fine issued, rp notified, will issue all trade hold if not cleaned 4/1
|
ESC19-00836
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 12:15:49 PM | | PASS |
|
|
No visible disturbances.
|
ESC18-01248
| Aging Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 11:09:52 AM | | PASS |
|
|
Work looks completed on garage and ADU. Vegetation starting to grown, BMPs still at bottom of hill.
|
ESC19-00819
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 11:00:37 AM | | CANC |
|
|
|
ESC19-00819
| DOC - Permit Finaled | 3/31/2020 | 3/31/2020 | 3/31/2020 11:00:31 AM | P | PASS |
|
|
|
ESC18-00983
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 10:38:14 AM | | PASS |
|
|
One home being framed on bottom section. One excavator working on tiger lilly starting to excavated for foundation. Roads and sidewalks clean, power broom on site.
|
ESC20-00319
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 10:32:11 AM | P | PASS |
|
|
No signs of disturbance.
|
ESC19-00584
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 10:23:44 AM | P | PASS |
|
|
Warm Springs is closed. No dewatering water is leaving site. West pond being dewaterewd into east and fill brought to north side. Very large stockpile starting to accumulate on site. Sewer work on nw side of project.
|
ESC19-00790
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 9:50:17 AM | | PASS |
|
|
No workers on site. Wattles prevented any runoff from leaving site.
|
ESC19-01581
| Site Preparation | 3/31/2020 | 3/31/2020 | 3/31/2020 9:37:01 AM | P | PASS |
|
|
All pemit issues have been resolved. Rough grading completed. I hung up permit on job board. No esc issues.
|
ESC20-00242
| Site Final | 3/31/2020 | 3/31/2020 | 3/31/2020 9:36:13 AM | P | PASS |
|
|
|
ESC19-01706
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 9:17:13 AM | P | PASS |
|
|
Titanium on site doing water and sewer, Boise Ave is closed. Street will need to be cleaned after being patched.
|
ESC18-00175
| Aging Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 9:05:28 AM | | PASS |
|
|
No issues at site.
|
ESC19-00541
| General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 8:36:16 AM | | CANC |
|
|
|
ESC18-01432
| Site Final | 3/30/2020 | 3/31/2020 | 3/30/2020 9:16:24 AM | A | NR |
|
|
Landscapers still on site. Inleet protection still installed in parking lot and road.
|