ESC19-00611
| General Inspection | 3/4/2020 | 3/4/2020 | 3/5/2020 2:06:21 PM | | PASS |
|
|
Exterior completed. Site is clean, some small pieces of trash around trash box.
|
ESC18-01455
| General Inspection | 3/4/2020 | 3/4/2020 | 3/5/2020 1:59:51 PM | | PASS |
|
|
Lot clean and conjtained. No trackout from driveway.
|
ESC19-00260
| General Inspection | 3/4/2020 | 3/4/2020 | 3/5/2020 9:39:05 AM | | PASS |
|
|
Crew on site setting form for reating walls and wall along driveway. Site is clean, drainage channel has had trash picked up.
|
ESC18-00844
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 1:49:27 PM | | PASS |
|
|
Home completed, landscaping and revegetation in progress.
|
ESC18-01576
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 1:43:13 PM | | PASS |
|
|
|
ESC19-00301
| Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 12:17:35 PM | | PASS |
|
|
All contained in ID Power yard.
|
ESC18-01447
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 12:01:53 PM | P | PASS |
|
|
Site is clean and contained. No issues.
|
ESC19-00396
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 11:51:00 AM | P | PASS |
|
|
Site is trash free, most of stucco work completed. No trackout.
|
ESC19-01457
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 11:50:27 AM | P | PASS |
|
|
WIP on forms and foundation, large washout on site. Large pile of backfill, will need to watch for runoff or seeing if it needs to be stabalized. Trailers in dirt, is currently dry.
|
ESC18-01022
| Conference | 3/4/2020 | 3/4/2020 | 3/4/2020 11:41:11 AM | P | PASS |
|
|
Collin has meeting with Veasy scheduled for site. Will go over which areas need to be reseeded. Retention pond isn't ready and wont be seeded, needs ACHD approval, also neededs to put in walking path for HOA to get final plat approval. Plan is to seed new disturbed areas and section where seeding didn't take.
|
ESC15-00857
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 11:28:44 AM | | PASS |
|
|
Siotye is clean. Building lots are taking care of their own BMPs and are clean. Washout being used. Will just need to watch trackout from form trailers and concrete trucks.
|
ESC17-01287
| General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 10:54:53 AM | | PASS |
|
|
No rilling or failures, grass starting to grow.
|
ESC19-00247
| Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 9:56:15 AM | | PASS |
|
|
Gravel drive and gravel surrounding homes. No loose trash, site clean. Still needs landscaping on dirt berms along Franklin
|
ESC18-01304
| Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 9:55:03 AM | | PASS |
|
|
Building is completed, not landscaped. Work on project next door, Shares common drive.
|
ESC19-01131
| Site Preparation | 3/4/2020 | 3/4/2020 | 3/4/2020 9:53:30 AM | P | PASS |
|
|
Work has begun on parking lot excavation. All backfill store on lot. Parcel is connected to building to west, will have a shared drive. Work is where curb cut and entrance where, currently employees parked on street.
|
ESC18-01015
| Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 9:26:52 AM | | PASS |
|
|
Building completed. Surrounded by pit run then lawn. Behind chuch and contained, no issues.
|