Inspections for the day of: Monday, March 5, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01243 Aging Inspection3/5/20183/5/20183/7/2018 10:33:10 AM CANC
ESC17-00426 General Inspection3/5/20183/5/20183/7/2018 10:24:36 AMPPASS
Road and sidewalk complete. No homes have begun in phase.
ESC16-00879 General Inspection3/5/20183/5/20183/6/2018 11:54:03 AM FAIL
Dirt and trackout throughout site. Washout has been dumped onto the ground.
ESC15-00976 General Inspection3/5/20183/5/20183/5/2018 2:34:18 PM PASS
Framing on phase 2, interior work also in progress. Site is clean, no issues.
ESC16-00968 Aging Inspection3/5/20183/5/20183/5/2018 2:16:58 PM PASS
Work on foundation for garage. All disturbance is on side and rear. No issues at time of inspection.
ESC16-01352 Aging Inspection3/5/20183/5/20183/5/2018 2:06:18 PM PASS
Will close ESC when all other permits closed.
ESC17-00227 General Inspection3/5/20183/5/20183/5/2018 1:51:00 PM PASS
BMPs in place and in good shape. Owner is currently on site and monitors project.
ESC17-00249 General Inspection3/5/20183/5/20183/5/2018 11:59:38 AM PART
No one parked in mud behind project. No trackout onto warm springs. Site still needs to be cleaned. RP info on trailer not up to date.
ESC17-00336 General Inspection3/5/20183/5/20183/5/2018 11:40:31 AM CANC
ESC17-00336 DOC - Permit Finaled3/5/20183/5/20183/5/2018 11:40:24 AMPPASS
ESC17-00018 General Inspection3/5/20183/5/20183/5/2018 11:13:48 AM FAIL
Area needs to be swept, dirt and trackout throughout site. Building lots are dirty and need to be cleaned. Sent email to listed RP.
ESC17-01362 Site Preparation3/5/20183/5/20183/5/2018 10:41:51 AMPPASS
Wattle installed around greenbelt. Plan on getting in Eco pan before concrete. SWPPP board is being brought over and installed. Grading in process.