ESC18-01531
| Site Preparation | 3/5/2019 | 3/5/2019 | 3/7/2019 12:42:13 PM | P | PART |
|
|
Called builder never called back. Excavation has begun. Will need to watch for runoff down hill and maintain silt fence. Wattle along front of perimeter is old and will need to be monitored. No BMPs on downhill side of lot, no permit dislayed.
|
ESC18-00311
| General Inspection | 3/5/2019 | 3/5/2019 | 3/6/2019 1:13:18 PM | | PASS |
|
|
Corrections requested for area were made.
|
ESC17-01009
| General Inspection | 3/5/2019 | 3/5/2019 | 3/6/2019 8:53:59 AM | | PASS |
|
|
Inspected 3-5. No esc issues
|
ESC18-01705
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 4:01:05 PM | P | FAIL |
|
|
List of corrections and pictures sent to RP. Corrections to be made by 2:00 PM Friday March 8th. Clean sidewalks and road. Pick up and reinstall permit signs. Clean up loose trash. Install wattles where needed. Install barriers to prevent vehicles from driving in mud.
|
ESC18-01706
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 4:00:46 PM | P | FAIL |
|
|
List of corrections and pictures sent to RP. Corrections to be made by 2:00 PM Friday March 8th. Clean sidewalks and road. Pick up and reinstall permit signs. Clean up loose trash. Install wattles where needed. Install barriers to prevent vehicles from driving in mud.
|
ESC18-01167
| BMP Violation | 3/5/2019 | 3/5/2019 | 3/5/2019 3:25:29 PM | P | FAIL |
|
|
Trackout onto first and state st. Excuse was "entrance is being removed tommorow." Streets need to be swept and RP needs to be proactive.
|
ESC16-00625
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 3:12:09 PM | | PASS |
|
|
All work completed.
|
ESC18-00363
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 3:07:11 PM | | PASS |
|
|
Gate is closed and locked. No dirt leaving to street.
|
ESC19-00206
| Site Preparation | 3/4/2019 | 3/5/2019 | 3/5/2019 1:50:17 PM | A | PASS |
|
|
Met with crew on site. Permit has been picked up and displayed. Asked for some silt fence or wattle below wall, will properly dispose of washout.
|
ESC15-00857
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 1:26:23 PM | | PASS |
|
|
Met with RPs and owner on site. Repairs were made on upper end of site to contain and slow flow of water down hill. Ponds currently have capacity to absorb water. Witches hats have been replaced.
|
ESC18-00559
| Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 12:07:46 PM | | PASS |
|
|
All work looks complete, no ESC issues.
|
ESC17-01236
| Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 11:45:06 AM | | PASS |
|
|
Lot still vacant, no activity.
|
ESC17-01455
| Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 11:28:03 AM | | PASS |
|
|
Home mearly completed, painters on site. Lot still needs landscaping.
|
ESC18-00358
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 11:18:15 AM | | PART |
|
|
Lots of mud in contractor parking lot from genie lift. No dirt is leaving site.
|
ESC18-00280
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 11:04:55 AM | | PASS |
|
|
Perimeter silt fence on site and intact. Tuffy has machines on site, no active work at time of inspection. Water and hydrants installed, future road staked. Nothing leaving site.
|
ESC18-01074
| Site Final | 3/4/2019 | 3/5/2019 | 3/5/2019 10:43:28 AM | P | PASS |
|
|
Call me if you need access inside the substation. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
|
ESC18-00203
| Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 8:29:41 AM | | CANC |
|
|
|
ESC17-01343
| Aging Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 8:24:32 AM | | CANC |
|
|
|
ESC17-01343
| DOC - Permit Finaled | 3/5/2019 | 3/5/2019 | 3/5/2019 8:24:27 AM | P | PASS |
|
|
Expired
|
ESC15-00094
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 8:23:48 AM | | CANC |
|
|
|
ESC15-00094
| DOC - Permit Finaled | 3/5/2019 | 3/5/2019 | 3/5/2019 8:23:43 AM | P | PASS |
|
|
Neighborhood nearly completed and landscaped. Stormwater all contained. Lots being built are responsible for their own BMPs.
|
ESC18-00392
| General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 8:14:43 AM | | PASS |
|
|
Needs final stabalization.
|