Inspections for the day of: Thursday, March 5, 2020.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00954 General Inspection3/5/20203/5/20203/5/2020 1:55:00 PMPPASS
All lots without homes are stable with good growth. Nothing coming off road above site. Nobody parked on empty lots.
ESC19-00696 General Inspection3/5/20203/5/20203/5/2020 1:50:53 PM PASS
Home exterior about completed. Washout was used for stucco. Silt fence needs to be repaired. Nothing leaving site.
ESC19-00998 General Inspection3/5/20203/5/20203/5/2020 1:50:00 PMPPASS
Knife River on site doing water. Bulldog till prime for site work. No escx issues, site clean.
ESC18-00818 General Inspection3/5/20203/5/20203/5/2020 12:18:18 PM PASS
Site still needs landscaping. Exterior work and stairs look like they have been completed.
ESC19-00619 Aging Inspection3/5/20203/5/20203/5/2020 12:15:16 PM CANC
ESC19-00619 DOC - Permit Finaled3/5/20203/5/20203/5/2020 12:15:10 PMPPASS
All work completed, area stable. BLD still open.
ESC19-00692 General Inspection3/5/20203/5/20203/5/2020 12:03:23 PM CANC
ESC19-00692 DOC - Permit Finaled3/5/20203/5/20203/5/2020 12:03:18 PMPPASS
ESC19-00537 Aging Inspection3/5/20203/5/20203/5/2020 11:54:31 AM CANC
ESC19-00537 DOC - Permit Finaled3/5/20203/5/20203/5/2020 11:54:25 AMPPASS
ESC15-00853 General Inspection3/5/20203/5/20203/5/2020 11:46:26 AM PART
Site is contained, nothing making it to hill road.
Washout was removed for new foundations, forms being placed, will need new washout before pour.
Lots of dirt within site, trash needs to be picked up, mostly empty bottles, cans, wrappers, etc.
ESC19-00647 General Inspection3/5/20203/5/20203/5/2020 11:24:56 AM PASS
Met with builder at site. Area is clean, rock entrance, streets and sidewalks swept. All trash is going into box. Gutters are installed, not piped in, no down spouts installed.
ESC18-00488 General Inspection3/5/20203/5/20203/5/2020 10:38:27 AMPPASS
Met with Gus while on site. Foundations are poured. Multiple homes being framed, they are keeping a better watch on trash due to wind. All trash contained during inspection.
ESC19-00918 General Inspection3/5/20203/5/20203/5/2020 10:29:37 AMPPASS
WIP on framing.
ESC18-00426 Tracking Control3/2/20203/5/20203/4/2020 10:25:58 AMAPART
Backfill has been removed and street scraped. Still needs to be swept, follow up scheduled.
Talked to RP at original inspection, follow up was ahead of schedule since I was in area.