ESC17-00954
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 1:55:00 PM | P | PASS |
|
|
All lots without homes are stable with good growth. Nothing coming off road above site. Nobody parked on empty lots.
|
ESC19-00696
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 1:50:53 PM | | PASS |
|
|
Home exterior about completed. Washout was used for stucco. Silt fence needs to be repaired. Nothing leaving site.
|
ESC19-00998
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 1:50:00 PM | P | PASS |
|
|
Knife River on site doing water. Bulldog till prime for site work. No escx issues, site clean.
|
ESC18-00818
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 12:18:18 PM | | PASS |
|
|
Site still needs landscaping. Exterior work and stairs look like they have been completed.
|
ESC19-00619
| Aging Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 12:15:16 PM | | CANC |
|
|
|
ESC19-00619
| DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 12:15:10 PM | P | PASS |
|
|
All work completed, area stable. BLD still open.
|
ESC19-00692
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 12:03:23 PM | | CANC |
|
|
|
ESC19-00692
| DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 12:03:18 PM | P | PASS |
|
|
|
ESC19-00537
| Aging Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 11:54:31 AM | | CANC |
|
|
|
ESC19-00537
| DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 11:54:25 AM | P | PASS |
|
|
|
ESC15-00853
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 11:46:26 AM | | PART |
|
|
Site is contained, nothing making it to hill road. Washout was removed for new foundations, forms being placed, will need new washout before pour. Lots of dirt within site, trash needs to be picked up, mostly empty bottles, cans, wrappers, etc.
|
ESC19-00647
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 11:24:56 AM | | PASS |
|
|
Met with builder at site. Area is clean, rock entrance, streets and sidewalks swept. All trash is going into box. Gutters are installed, not piped in, no down spouts installed.
|
ESC18-00488
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 10:38:27 AM | P | PASS |
|
|
Met with Gus while on site. Foundations are poured. Multiple homes being framed, they are keeping a better watch on trash due to wind. All trash contained during inspection.
|
ESC19-00918
| General Inspection | 3/5/2020 | 3/5/2020 | 3/5/2020 10:29:37 AM | P | PASS |
|
|
WIP on framing.
|
ESC18-00426
| Tracking Control | 3/2/2020 | 3/5/2020 | 3/4/2020 10:25:58 AM | A | PART |
|
|
Backfill has been removed and street scraped. Still needs to be swept, follow up scheduled. Talked to RP at original inspection, follow up was ahead of schedule since I was in area.
|