ESC18-00977
| General Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 12:30:14 PM | P | PASS |
|
|
NO ESC issues, no loose trash.
|
ESC17-00860
| Aging Inspection | 4/1/2019 | 4/1/2019 | 4/2/2019 9:31:46 AM | | PASS |
|
|
Silt fence still installed, driveway is pit run. Nothing leaving site.
|
ESC16-00968
| Aging Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 2:23:01 PM | | PASS |
|
|
Area landscaped, work looks completed. Building permit still opened.
|
ESC17-00640
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 2:12:51 PM | | PASS |
|
|
Rear hillside has ECB. Lot still needs landscaping.
|
ESC18-00075
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 2:06:31 PM | | PASS |
|
|
|
ESC17-00985
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 2:06:16 PM | | PART |
|
|
Wattle on lower perimeter. Lots of dirt coming from work area down hill onto HOA property. Wattle is below, no staked in. Nothing reaching road. Will monitor after rain events.
|
ESC16-01651
| Aging Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 12:29:37 PM | | CANC |
|
|
|
ESC16-01651
| DOC - Permit Finaled | 4/1/2019 | 4/1/2019 | 4/1/2019 12:29:28 PM | P | PASS |
|
|
All homes completed, neighborhood BMPs removed.
|
ESC17-00426
| Aging Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 12:24:15 PM | | PASS |
|
|
Crews replacing sidewalks near ped ramps in phase 1. Few lots need landscaping in phase 2, rest of work completed. All foundations completed in phase 3. Most homes complete. Some dirt tracked into cul-de-sac, has been swept up.
|
ESC17-00700
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 12:11:54 PM | | PASS |
|
|
Work on last facade. Nothing leaving site, storage is its own fenced off area. Dumpster provided and being used.
|
ESC18-00670
| General Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 11:39:07 AM | P | PASS |
|
|
Shop is completed, driveway poured. Area still needs stabalization and landscaping. No dirt leaving site, no ESC issues.
|
ESC18-00987
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 10:24:03 AM | P | CANC |
|
|
|
ESC18-00987
| DOC - Permit Finaled | 4/1/2019 | 4/1/2019 | 4/1/2019 10:23:57 AM | P | PASS |
|
|
|
ESC17-00895
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 10:13:53 AM | | PASS |
|
|
Work on homes in rear. Foundation at front complete, no new work. Inlet protection installed and about 1/4th full.
|
ESC17-00189
| Aging Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 9:56:59 AM | | CANC |
|
|
|
ESC17-00189
| DOC - Permit Finaled | 4/1/2019 | 4/1/2019 | 4/1/2019 9:56:53 AM | P | PASS |
|
|
expired
|
ESC18-01283
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 9:46:51 AM | P | PART |
|
|
Sand has been dumped on stabalized entrance for use in seepage beds. Some trackout from front onto Elder, sweeper on site. Will bring washout before pouring. Follow up scheduled for thursday.
|
ESC16-01278
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 9:26:54 AM | | PASS |
|
|
Two remaining homes in phase. Witches hats still installed. No ESC issues in neighborhood.
|
ESC18-01038
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 9:23:47 AM | P | PASS |
|
|
Home completed, lot needs trash picked up and landscaping.
|
ESC18-00939
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 9:23:30 AM | P | PASS |
|
|
Home completed, lot needs trash picked up and landscaping.
|
ESC17-01157
| General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 8:35:15 AM | | CANC |
|
|
|