ESC19-01706
| General Inspection | 4/23/2020 | 4/23/2020 | 4/24/2020 9:56:36 AM | P | PASS |
|
|
Sidewalks LLc on side doing curbing, knife river delivering mud. Did not see a washout or any dumped washout on site. No construction entrance, area is prepped for road bed. Sidewalk and curbing on Boise ASve also needs to be installed.
|
ESC06-01306
| Site Final | 4/23/2020 | 4/23/2020 | 4/24/2020 9:21:35 AM | P | PASS |
|
|
Exterior construction and landscaping completed. Site is clean, no issues.
|
ESC19-00859
| Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:53:10 PM | | CANC |
|
|
|
ESC19-00859
| DOC - Permit Finaled | 4/23/2020 | 4/23/2020 | 4/23/2020 2:53:00 PM | P | PASS |
|
|
|
ESC19-00836
| DOC - Permit Finaled | 4/23/2020 | 4/23/2020 | 4/23/2020 2:52:25 PM | P | PASS |
|
|
Looks completed, no disturbed area. No recent BLD activity.
|
ESC19-00927
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:42:21 PM | P | PASS |
|
|
Post rain inspection. Hillside shows no damage or rilling. No issues at site, no runoff from bottom.
|
ESC19-00895
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 2:36:42 PM | | PASS |
|
|
|
ESC17-00985
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 1:17:58 PM | | PASS |
|
|
Site is contained, hillside stable.
|
ESC19-00324
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 12:11:43 PM | P | FAIL |
|
|
RP on site Utility work along warm springs. Lots of tracking across street from Boven. Silt fence will need to be repaired along warm springs. Upper section is clean. No rills or discharged. Hillside have some growth and held up well.
|
ESC19-00371
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 11:49:04 AM | P | FAIL |
|
|
Curbing and sidewalks done on first phase of upper section, road bed installed and not paved. Grass is growing very well. Ridgepoint is closed, crew on site. Met with Mark, Dave, and Steve on site. Part of bypass pipe may be blocked or broken. Water is coming out of sewer top, running into creek, and into new line being installed. Water is ending up behind dam instead of around it. L2 is doing minimal work today since it is to wet. They want to have sewer connection done within 7 days. Took turbidity readings: Pond on Vortex 308 NTU Bypass below dam 481 NTU Creek outflow at bottom of site: 373 NTU. Creek between overflow and dam, all stays on site :658 NTU Everyone was notified of issue, working on solutions.
|
ESC19-00260
| General Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 11:39:53 AM | | PASS |
|
|
Landscapers on site, some materials stored on road. No runoff or trash in drainage channel.
|
ESC19-01494
| Tracking Control | 4/23/2020 | 4/23/2020 | 4/23/2020 9:44:10 AM | P | FAIL |
|
|
Message sent to RP. Workers parked on muddy driveway. Some trackout.
|