ESC18-01678
| Aging Inspection | 4/27/2020 | 4/27/2020 | 4/28/2020 12:30:49 PM | | PASS |
|
|
Home is framed and Tyvek wrapped. Lawn still in place, lot is clean and contained.
|
ESC19-01173
| Site Final | 4/27/2020 | 4/27/2020 | 4/27/2020 12:14:53 PM | P | NR |
|
|
Site not landscaped, still trash and debris on site.
|
ESC19-00734
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 12:12:43 PM | P | PASS |
|
|
WIP on interior. Only small disturbed area along front of home. All drainage is onto site, no issues.
|
ESC19-01106
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 12:09:56 PM | P | PASS |
|
|
Old home has been demoed. WIP on one new home. Driveway is paved to Pierce. Site is clean, no issues.
|
ESC19-00506
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 12:07:52 PM | P | PASS |
|
|
No new activity. Sections of sidewalk that were ripped out still not repaired.
|
ESC19-00076
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 12:05:47 PM | | PASS |
|
|
ALL work is interior. Ring around new school has been paved, area has not been landscaped. Clean, no issues.
|
ESC20-00054
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 11:34:58 AM | P | PASS |
|
|
Rough grading looks completed, you can see where lots and roads will be. Heavy equipment has been pulled off site. Track utilities on site doing some joint trench.
|
ESC17-00971
| Aging Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 11:11:46 AM | | PASS |
|
|
Neighborhood nearly completed. Landscapers on site planting sod and doing rock work.
|
ESC18-01233
| Aging Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 11:06:17 AM | | DEFR |
|
|
Building inspector looking at ESC.
|
ESC20-00144
| Tracking Control | 4/27/2020 | 4/27/2020 | 4/27/2020 11:02:14 AM | P | FAIL |
|
|
Met with PM and Radix who is doing dirt work. Tracking will be cleaned.
|
ESC19-00160
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 10:42:55 AM | | PASS |
|
|
Met with superintendant at site. Some areas of joint trench need to be repaired. Concrete work completed until flat work. Plan is to get roads in before verticle construction.
|
ESC18-01465
| Aging Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 9:40:14 AM | | CANC |
|
|
|
ESC18-01465
| DOC - Permit Finaled | 4/27/2020 | 4/27/2020 | 4/27/2020 9:40:08 AM | P | PASS |
|
|
No disturbances, no BLD activity for over 6 months
|
ESC18-00023
| General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 9:26:54 AM | | PASS |
|
|
No activity. Site has complete grass coverage. Silt fence along southern perimeter serving no purpose, has started to fall over. Entrance is being used to sell used vehicles.
|
ESC20-00343
| Site Preparation | 4/24/2020 | 4/27/2020 | 4/27/2020 9:12:33 AM | P | PASS |
|
|
Met RP on site. DIs are all protected. Crew is on site to start saw cutting. Will bring pan for washout when pours begin. Don't plan on stripping parking lot until two days before paving. Will need to do some site compaction work for bed.
|