ESC18-01235
| General Inspection | 4/28/2020 | 4/28/2020 | 4/29/2020 9:35:46 AM | | PASS |
|
|
Still some backfill around pool. Hillside is mostly regraded, no seeding on new area. Old graded area is seeing growth. Pool guys didn't use washout, sent message to RP. Will not issue fine since site has been in compliance, only a warning.
|
ESC13-00806
| General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 1:52:36 PM | | PASS |
|
|
|
ESC19-00270
| Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 1:52:25 PM | | PASS |
|
|
Loty now has topsoil, still needs to be landscaped.
|
ESC19-00249
| Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 11:47:19 AM | | PASS |
|
|
Site still needs landscaping. Driveway is clean rock, no issues at site.
|
ESC19-00289
| Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 11:34:03 AM | | PASS |
|
|
Landscapers on site doing sprinklers for almost every home. Lined concrete washout on site. Only vacant lots are the ones the furthest west. All home exterior work is completed. Landscapers need to sweep when work completed.
|
ESC20-00049
| General Inspection | 4/24/2020 | 4/28/2020 | 4/28/2020 11:17:00 AM | P | PASS |
|
|
Excavation has begun on side of building. Parking lot has been preserved. Large grass buffer, no tracking off site. Dumpster on pavement. Hauling of fill, loading on parking lot.
|
ESC19-00480
| Site Final | 4/23/2020 | 4/28/2020 | 4/28/2020 11:00:08 AM | A | PASS |
|
|
check that DI bag on Eagleson south of common drive is removed.
|
ESC19-00293
| Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 10:48:46 AM | | CANC |
|
|
|
ESC19-00293
| DOC - Permit Finaled | 4/28/2020 | 4/28/2020 | 4/28/2020 10:48:36 AM | P | PASS |
|
|
expired. No sign of work, no bld activity for over 1 year.
|
ESC19-00211
| Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 10:35:05 AM | | PASS |
|
|
WIP on framing. All work behind home and contained.
|
ESC19-01545
| DOC - Permit Finaled | 4/28/2020 | 4/28/2020 | 4/28/2020 10:27:57 AM | P | PASS |
|
|
|
ESC17-00018
| General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 10:26:40 AM | | PASS |
|
|
One home under construction, few vacant lots. Washout pan was overflowed, talked to builder RP and he said he'd get it cleaned.
|
ESC19-01581
| General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 10:12:35 AM | P | PASS |
|
|
Hauling in material to raise site elevation. No trackout, no issues at site.
|
ESC18-01636
| General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 10:11:13 AM | | PASS |
|
|
One grader working on east side of project. Black Rock has cleaned their mess that was going into the knife river project. West area has one dozer moving fill material. Pile of contanimated soil still on far west of project. Sewer work on south of project. Currently installing box on west of last pond. Dewatering straight into pond. Still some sewer work on far east, boxes not on site yet.
|
ESC19-00756
| General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 8:41:54 AM | | DEFR |
|
|
Talked to RP. Will schedule final when homes on Heartleaf have been landscaped.
|