ESC18-01022
| General Inspection | 4/29/2020 | 4/29/2020 | 5/1/2020 11:07:38 AM | | PASS |
|
|
Very little water in retention pond. Load of riprap delivered at bottom for pond. No runoff onto road, no issues at site.
|
ESC19-00814
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 11:50:35 AM | | PASS |
|
|
Parking lot paved, curbing and sidewalks completed. None of the grass areas have been landscaped. No issues.
|
ESC19-00093
| Aging Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 11:17:00 AM | | PASS |
|
|
Work completed, needs landscaping.
|
ESC19-00558
| Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 11:11:55 AM | P | PASS |
|
|
|
ESC18-01411
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 11:04:01 AM | | PASS |
|
|
Curbing completed, crew prepping parking lot bed for paving. Expect to begin paving on 5/4. Parking lot drains will be contained on own system. Will be no disturbed area once paved, gave PM ok to not put in protection in parking lot. Crew almost done texturing exterior walls, they are using drop cloths. Site is clean.
|
ESC19-00904
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 10:30:23 AM | | PASS |
|
|
Needs landscaping.
|
ESC19-00760
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 10:30:03 AM | | CANC |
|
|
|
ESC19-00760
| DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 10:29:57 AM | P | PASS |
|
|
|
ESC18-00983
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 10:21:30 AM | P | PASS |
|
|
5 homes framed on bottom section. Workers on site are doing mechanical. All foundations on lower section poured. Strrets and sidewalks are clean. Hillside is well vegetated, still has same 1 rill running down, it has been filled and retackified, no new growth. No work along Danzee, lots are bare, weeds starting to grow. Foundations on north of Tiger Lilly poured, working on foundations on south side. No crews at site doing foundation work today, washout in use, located in garage of new pad.
|
ESC18-01748
| Aging Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 10:21:08 AM | | PASS |
|
|
|
ESC19-01494
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 9:51:37 AM | P | PASS |
|
|
Site is clean, no loose trash or building debris. No tracking.
|
ESC19-00178
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 9:50:57 AM | | PASS |
|
|
Pool is done, still doing work on concrete patio and around pool. Site still needs landscaping. Nothing leaving site, no issues.
|
ESC19-00082
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 9:19:22 AM | | PASS |
|
|
Workers on site framing. BMPs still installed, look rough but working. All material stored on lot and workers parked on street. Section of sidewalk has been broken and will need repair.
|
ESC19-00779
| General Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 8:56:42 AM | | PASS |
|
|
WIP on vertical. Site surrounded by fence an k-rails. Staging and storage area is on existing paved parking lot. Site is clean, no trash or dirt. Talked with PM, only concern is to clean fire insulation off road, some has fallen after spraying.
|
ESC19-00572
| Aging Inspection | 4/29/2020 | 4/29/2020 | 4/29/2020 8:27:11 AM | | CANC |
|
|
|
ESC19-00572
| DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 8:27:06 AM | P | PASS |
|
|
|