Inspections for the day of: Friday, April 3, 2020.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00626 Site Final4/2/20204/3/20204/7/2020 10:25:43 AMPPASS
ESC19-00674 Site Final4/2/20204/3/20204/7/2020 9:40:16 AMPPASS
ESC19-00679 Site Final4/2/20204/3/20204/7/2020 9:38:21 AMPPASS
ESC19-00839 General Inspection4/3/20204/3/20204/6/2020 10:40:25 AM PASS
Work on Fairview exit completed, gate is closed.
Waiting for site to dry, won't pass compaction for road beds.
Pump truck on site doing pours for balconies. Concrete trucks using washout.
Crew was cleaning track pads, lots of tracking from genie lift.
ESC19-00581 General Inspection4/3/20204/3/20204/3/2020 12:30:20 PM PASS
Site contained.
ESC19-01345 General Inspection4/3/20204/3/20204/3/2020 12:30:03 PMPPASS
No blowouts below home. Masons and stucco have made a mess out front.
ESC18-00844 Site Final4/3/20204/3/20204/3/2020 11:28:13 AMPNR
Still working on landscaping, wattles on perimeter.
ESC19-00574 General Inspection4/3/20204/3/20204/3/2020 11:15:16 AM DEFR
Gate off Veterans was closed and locked.
ESC19-01735 Complaint Inspection4/2/20204/3/20204/3/2020 11:08:42 AMAPASS
Street has been swept. Sent message and picture to RP just reminding him to keep up on site.
ESC19-00931 Site Final4/2/20204/3/20204/3/2020 11:00:22 AMPNR
Driveway is gravel, no landscaping.
ESC19-00245 General Inspection4/3/20204/3/20204/3/2020 10:35:23 AM PASS
Currently revegetating.
ESC18-01636 General Inspection4/3/20204/3/20204/3/2020 10:34:25 AMPPASS
Stockpiles of material. Crew working on water lines.
ESC19-00584 General Inspection4/3/20204/3/20204/3/2020 10:25:00 AMPPASS
Work has begun on new western pond. Contanimated soil is stored seperately on visqueen. Spoke with geo engineer while on site. DEQ gave ok to pump new pond water into middle pond, contanimated soil was above water table.
Met with Rex, finishing up and cleaning around middle pond. Overflow still needs to be ran to eastern pond. Pump will be relocated to furthest west to pump in middle.
Warm Springs has been patched, will get swept and opened to traffic tonight.
Still hauling material to noth side.
ESC19-00623 Aging Inspection4/3/20204/3/20204/3/2020 9:26:33 AM PASS
WIP on interior, no issues at site.
ESC19-01386 Tracking Control4/1/20204/3/20204/3/2020 9:26:10 AMAPASS
Talked with RP.
Site cleaned
ESC19-00309 Aging Inspection4/3/20204/3/20204/3/2020 9:15:35 AM CANC
ESC19-00309 DOC - Permit Finaled4/3/20204/3/20204/3/2020 9:15:28 AMPPASS
ESC19-00719 Aging Inspection4/3/20204/3/20204/3/2020 8:38:03 AM CANC
ESC19-00719 DOC - Permit Finaled4/3/20204/3/20204/3/2020 8:38:00 AMPPASS