Inspections for the day of: Tuesday, April 30, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00954 General Inspection4/30/20194/30/20195/3/2019 11:19:59 AMPPASS
No major issues at site, has been dry. Hillside vegetation growing in. Home with roofs still don't have gutters and may have concentrated flow when it rains. Gravel snake bags ran over and falling apart. Some loose trash blown from house on left into vacant lot.
ESC18-00804 General Inspection4/30/20194/30/20195/1/2019 1:00:26 PM PASS
Metal building is up. Construction entrance in place. Will need to watch for mud when rains.
ESC18-00830 Aging Inspection4/30/20194/30/20194/30/2019 2:14:55 PM CANC
ESC18-00830 DOC - Permit Finaled4/30/20194/30/20194/30/2019 2:14:48 PMPPASS
ESC18-00513 Aging Inspection4/30/20194/30/20194/30/2019 2:09:52 PM PASS
Multiple permits still open. No disturbances seen from front gate.
ESC18-00833 Aging Inspection4/30/20194/30/20194/30/2019 2:07:24 PM CANC
ESC18-00833 DOC - Permit Finaled4/30/20194/30/20194/30/2019 2:07:18 PMPPASS
ESC17-01323 Site Final4/29/20194/30/20194/30/2019 2:05:31 PMPPASS
ESC18-00818 General Inspection4/30/20194/30/20194/30/2019 12:46:58 PM PASS
No workers on site. All building material on lot, trash box on lolt. No trackout or dirt on sidewalk.
ESC18-00618 General Inspection4/30/20194/30/20194/30/2019 12:03:09 PM CANC
ESC18-00618 DOC - Permit Finaled4/30/20194/30/20194/30/2019 12:03:02 PMPPASS
ESC18-01289 General Inspection4/30/20194/30/20194/30/2019 11:57:48 AMPPASS
Shotcrete wall completed, perimeter wall for first building completed. Getting ready to start with floors, will bring back eco pans. Roads are clean, not much activity.
ESC18-00983 General Inspection4/30/20194/30/20194/30/2019 11:29:41 AMPPART
Some trackout onto Holcomb, lots of dust when cars run it over. Entrance is compacted and corner cut.
Lots of dust when trucks pull into entrance.
RP notified and follow up scheduled.
ESC19-00421 General Inspection4/22/20194/30/20194/30/2019 10:03:06 AMPPASS
Last section of greenbelt on hold due to high water. Area excavated is about even with creek elevation and full of water. Met with GC Rusty, is moving equipment of site, not expecting rivers to drop for at least 6 weeks.
ESC18-01597 General Inspection4/30/20194/30/20194/30/2019 9:42:03 AMPPASS
WIP on framing. Concrete washout damaged when backfill removed, will need to be rebuilt or repaired. Site is clean, no ESC issues.
ESC18-00558 General Inspection4/30/20194/30/20194/30/2019 9:36:58 AM PASS
Home is completed and lot landscaped. Multiple perits still opened.