ESC15-00306
| General Inspection | 4/4/2018 | 4/4/2018 | 4/6/2018 11:10:33 AM | | PASS |
|
|
Work is complete and stabalization measures are in. BMPs have been removed from areas that were in flood plain. All workers and equipment have been removed from site. Greenbelt is still closed from Veterans Park to Simplot Park.
|
ESC17-00227
| General Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 12:01:47 PM | | PASS |
|
|
Some rills starting to form on site, no dirt is being transported off site. Lower wattles are starting to get build up of dirt on high side and will need to be dug out.
|
ESC17-01400
| General Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 10:48:26 AM | P | PASS |
|
|
Building is up. All dirt is stored on site with existing backfill. Nothing leaving work area.
|
ESC17-01137
| Site Final | 4/4/2018 | 4/4/2018 | 4/4/2018 2:46:27 PM | P | PASS |
|
|
Demo complete. Please see permit ESC17-01011 for CVS project
|
ESC15-00976
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 12:39:14 PM | | PASS |
|
|
Site perimeter has expanded and sidewalk on 16th is now blocked. No esc issues, site is contained and maintained.
|
ESC17-01011
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 12:25:21 PM | P | PASS |
|
|
Demo is complete, work to begin on new footings soon. No ESC issues, site is all contained.
|
ESC17-01172
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 11:48:55 AM | P | PEND |
|
|
WIP on steel frame. Stockpile contained on site. DI protection in front of bank needs to be changed. Some trackout from parking area across street.
|
ESC17-00470
| Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 11:45:35 AM | | PASS |
|
|
Trash on south end is all gone. Some trackout from people driving over sidewalks. Still a few stock piles on site.
|
ESC16-01027
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 11:23:45 AM | P | PART |
|
|
Lots of building waste on site that needs to be picked up and disposed. Two toilets on site have been tipped over. Some mud in gutter that needs to be scooped out. Site is still cleaner than it was earlier in project.
|
ESC16-01108
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 11:06:11 AM | | PASS |
|
|
WIP on multiple SFH. Little dirt leaving sites, area is mostly clean. Some lots have lots of lumber scraps. Port O Pottie tipped over at Irving and Highwood, will also check other development to see who it belongs to.
|
ESC17-00216
| Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 10:53:07 AM | | PASS |
|
|
WIP on 2665, 2675, 2685, all are in line with eachother. No dirt is leaving sites. Trash needs to be picked up.
|
ESC17-00217
| Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 10:52:52 AM | | PASS |
|
|
WIP on 2665, 2675, 2685, all are in line with eachother. No dirt is leaving sites. Trash needs to be picked up.
|
ESC17-00219
| Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 10:51:28 AM | | PASS |
|
|
WIP on 2665, 2675, 2685, all are in line with eachother. No dirt is leaving sites. Trash needs to be picked up.
|
ESC17-01088
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 10:33:23 AM | P | PASS |
|
|
Sidewalks and entrance off of Cloverdale now complete. Road inside development also completed. Site is currently idle.
|
ESC16-00879
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 10:10:49 AM | P | PART |
|
|
DI protection near Mitchell needs to be cleaned. Dirt and sand is ending up on roads and sidewalks throughout site.
|
ESC17-00027
| General Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 9:45:55 AM | P | PASS |
|
|
Gas station complete and open. Parcel on south is still exposed.
|
ESC16-01053
| Site Final | 4/2/2018 | 4/4/2018 | 4/4/2018 9:37:52 AM | P | PASS |
|
|
Work complete and stable. Will close when building permit is finaled.
|
ESC17-00508
| Aging Inspection | 4/4/2018 | 4/4/2018 | 4/4/2018 9:27:11 AM | | PASS |
|
|
WIP. Building material store in driveway. Site is contained. No loose trash or dirt.
|