ESC19-01125
| General Inspection | 4/6/2020 | 4/6/2020 | 4/7/2020 10:07:04 AM | P | PASS |
|
|
All exterior walls are now up. Some trench work along Freight, looks like gas lines. Site is bare and contained. Berms around perimeter.
|
ESC18-01289
| General Inspection | 4/6/2020 | 4/6/2020 | 4/7/2020 9:08:10 AM | | PASS |
|
|
Building up and acting as perimeter. No issues.
|
ESC19-00083
| DOC - Permit Finaled | 4/6/2020 | 4/6/2020 | 4/6/2020 1:25:17 PM | P | PASS |
|
|
|
ESC18-01118
| Aging Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 12:22:34 PM | | PASS |
|
|
WIP, home is framed and tyvek wrapped. Site contained.
|
ESC19-00156
| General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 12:08:21 PM | P | PASS |
|
|
Everything contained to site. Within site is muddy, will not be an issue unless lift leaves site. Ecopans on site for foundation work. Trash is cleaned up.
|
ESC19-01673
| General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 12:05:36 PM | P | PASS |
|
|
No trackout. Looks like irragation canal completed. Site is pretty well grade3d, one large stock pile of top soil
|
ESC20-00154
| General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 11:57:23 AM | P | PART |
|
|
SIte still needs a site prep. Looks like water lines for sewer have been run. There is an access along souther perimeter. Crews on site doing some prep work, play groung equipment has been disassembled and is on flat bed.
|
ESC18-01125
| Aging Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 11:46:53 AM | | PASS |
|
|
Permit in window, no visible disturbances.
|
ESC19-00401
| BMP Violation | 4/2/2020 | 4/6/2020 | 4/6/2020 11:40:17 AM | A | PASS |
|
|
No tracking to Milwaukee. Talked with shane while on site, has crew coming tommorow to clean, mud is tacky and to wet today to get anything done.
|
ESC19-00376
| General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 11:10:05 AM | P | PASS |
|
|
No work has begun on north side of project. New foundation being poured. Pump truck accessed the site from common drive, extra mud dumped on backfill, using on site washout. Common drive is dirty, no trackout. First common block on north is almost completed.
|
ESC18-00369
| Aging Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 10:52:18 AM | | PASS |
|
|
House is framed. Grass has grown surrounding perimeter.
|
ESC20-00054
| Tracking Control | 4/2/2020 | 4/6/2020 | 4/6/2020 10:51:49 AM | A | PASS |
|
|
Tracking has been cleaned. Clean fill placed on shoulder to keep vehicles out of mud.
|
ESC19-00181
| General Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 10:40:41 AM | | PASS |
|
|
Work on Fairview exit completed, gate is closed. Waiting for site to dry, won't pass compaction for road beds. Pump truck on site doing pours for balconies. Concrete trucks using washout. Crew was cleaning track pads, lots of tracking from genie lift.
|
ESC19-00480
| General Inspection | 4/3/2020 | 4/6/2020 | 4/6/2020 9:40:08 AM | P | PASS |
|
|
Working on interior. Outside completed and lot landscaped.
|
ESC19-00705
| Site Final | 4/3/2020 | 4/6/2020 | 4/6/2020 9:27:41 AM | P | PASS |
|
|
|
ESC19-01712
| Site Preparation | 4/3/2020 | 4/6/2020 | 4/6/2020 9:18:49 AM | A | PASS |
|
|
Work area is all contained, site below grade. Issues to watch for will be dust and trackout.
|
ESC19-01712
| Site Preparation | 4/3/2020 | 4/6/2020 | 4/6/2020 8:35:04 AM | A | CANC |
|
|
|