Inspections for the day of: Monday, April 6, 2020.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01125 General Inspection4/6/20204/6/20204/7/2020 10:07:04 AMPPASS
All exterior walls are now up. Some trench work along Freight, looks like gas lines. Site is bare and contained. Berms around perimeter.
ESC18-01289 General Inspection4/6/20204/6/20204/7/2020 9:08:10 AM PASS
Building up and acting as perimeter. No issues.
ESC19-00083 DOC - Permit Finaled4/6/20204/6/20204/6/2020 1:25:17 PMPPASS
ESC18-01118 Aging Inspection4/6/20204/6/20204/6/2020 12:22:34 PM PASS
WIP, home is framed and tyvek wrapped. Site contained.
ESC19-00156 General Inspection4/6/20204/6/20204/6/2020 12:08:21 PMPPASS
Everything contained to site. Within site is muddy, will not be an issue unless lift leaves site.
Ecopans on site for foundation work. Trash is cleaned up.
ESC19-01673 General Inspection4/6/20204/6/20204/6/2020 12:05:36 PMPPASS
No trackout.
Looks like irragation canal completed. Site is pretty well grade3d, one large stock pile of top soil
ESC20-00154 General Inspection4/6/20204/6/20204/6/2020 11:57:23 AMPPART
SIte still needs a site prep.
Looks like water lines for sewer have been run. There is an access along souther perimeter. Crews on site doing some prep work, play groung equipment has been disassembled and is on flat bed.
ESC18-01125 Aging Inspection4/6/20204/6/20204/6/2020 11:46:53 AM PASS
Permit in window, no visible disturbances.
ESC19-00401 BMP Violation4/2/20204/6/20204/6/2020 11:40:17 AMAPASS
No tracking to Milwaukee.
Talked with shane while on site, has crew coming tommorow to clean, mud is tacky and to wet today to get anything done.
ESC19-00376 General Inspection4/6/20204/6/20204/6/2020 11:10:05 AMPPASS
No work has begun on north side of project.
New foundation being poured. Pump truck accessed the site from common drive, extra mud dumped on backfill, using on site washout. Common drive is dirty, no trackout.
First common block on north is almost completed.
ESC18-00369 Aging Inspection4/6/20204/6/20204/6/2020 10:52:18 AM PASS
House is framed.
Grass has grown surrounding perimeter.
ESC20-00054 Tracking Control4/2/20204/6/20204/6/2020 10:51:49 AMAPASS
Tracking has been cleaned. Clean fill placed on shoulder to keep vehicles out of mud.
ESC19-00181 General Inspection4/6/20204/6/20204/6/2020 10:40:41 AM PASS
Work on Fairview exit completed, gate is closed.
Waiting for site to dry, won't pass compaction for road beds.
Pump truck on site doing pours for balconies. Concrete trucks using washout.
Crew was cleaning track pads, lots of tracking from genie lift.
ESC19-00480 General Inspection4/3/20204/6/20204/6/2020 9:40:08 AMPPASS
Working on interior. Outside completed and lot landscaped.
ESC19-00705 Site Final4/3/20204/6/20204/6/2020 9:27:41 AMPPASS
ESC19-01712 Site Preparation4/3/20204/6/20204/6/2020 9:18:49 AMAPASS
Work area is all contained, site below grade. Issues to watch for will be dust and trackout.
ESC19-01712 Site Preparation4/3/20204/6/20204/6/2020 8:35:04 AMACANC