ESC18-01770
| General Inspection | 5/1/2020 | 5/1/2020 | 5/5/2020 11:51:30 AM | | PASS |
|
|
Crews finishing up concrete curb work on site, sidewalks have been completed. Scheduled to pave parking lot on tuesday the 12th. Susan drive is closed and is getting repaired. Irragation water is backing up into parking area on north side. Buildings framed and only interior work remains.
|
ESC18-01771
| General Inspection | 5/1/2020 | 5/1/2020 | 5/5/2020 11:27:06 AM | | PASS |
|
|
Crews finishing up concrete curb work on site, sidewalks have been completed. Scheduled to pave parking lot on tuesday the 12th. Susan drive is closed and is getting repaired. Irragation water is backing up into parking area on north side. Buildings framed and only interior work remains.
|
ESC19-00283
| General Inspection | 5/1/2020 | 5/1/2020 | 5/4/2020 1:03:43 PM | | PASS |
|
|
Been in communication with RP regarding final stabilization. Has been seeded and has jute matting. Parks dept will make call if they are ok with measures. Will continue to monitor site.
|
ESC16-00353
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 1:06:16 PM | | PASS |
|
|
|
ESC19-00241
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 11:25:58 AM | | PASS |
|
|
Most curbing completed. Road bed prepped for paving. No tracking, site is clean and contained.
|
ESC19-00398
| General Inspection | 5/1/2020 | 5/1/2020 | 5/1/2020 10:53:34 AM | | PASS |
|
|
No issues, no blowouts from rain event.
|