ESC19-00156
| General Inspection | 5/8/2020 | 5/11/2020 | 5/18/2020 12:06:59 PM | P | PASS |
|
|
All sidewalks have been removed, site is below grade. Townhomes in multiple states of completion. No issues at site.
|
ESC20-00652
| General Inspection | 5/8/2020 | 5/11/2020 | 5/18/2020 11:22:12 AM | P | PASS |
|
|
Met with foreman at site. Gave him esc permit sign, Site is all below grade, excavation is within track perimeter. Drain inlets around track and in parking lot all protected. Plastic lined across track before entrance built. No trackout, sweeper atatchment on site.
|
ESC20-00480
| General Inspection | 5/8/2020 | 5/11/2020 | 5/18/2020 9:16:56 AM | P | PASS |
|
|
WIP on framing, trash going into box. Workers all parked on road. Some backfill and tracking on opposite side of canal, probably from ditch rider.
|
ESC20-00214
| Site Preparation | 5/8/2020 | 5/11/2020 | 5/13/2020 11:19:46 AM | P | PASS |
|
|
No activity has begun, installed permit sign at site.
|
ESC20-00448
| General Inspection | 5/11/2020 | 5/11/2020 | 5/12/2020 9:43:44 AM | P | PASS |
|
|
Suez is on Pierce installing new water lines. Forms have been place, some rebar, no workers at site. No washout on site yet. Backfill is piled on lot.
|
ESC19-00091
| General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 1:25:20 PM | | PASS |
|
|
Some areas of silt fence in rear under load. Site has large buffer on hillside. Lot is contained and has been kept clean.
|
ESC17-00315
| General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 1:18:55 PM | | PASS |
|
|
No activity. Considering expiring esc permit.
|
ESC18-01340
| Aging Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 12:15:52 PM | | PASS |
|
|
Site clean and contained, backyard still needs landscaping
|
ESC20-00293
| General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 11:19:37 AM | P | PASS |
|
|
Met builder on site. Has just started working on framing, has steel being coming soon. Backfill scheduled to be replaced. Site is clean.
|
ESC18-00498
| General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 11:08:51 AM | | PASS |
|
|
One home on Chardie almost finished and now being landscaped. No new homes have begun in phase. Repairs have started from blowout coming from home up in nines subdivision. No issues with any lots at site.
|
ESC19-00197
| Aging Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 10:52:58 AM | | CANC |
|
|
|
ESC19-00197
| DOC - Permit Finaled | 5/11/2020 | 5/11/2020 | 5/11/2020 10:52:53 AM | P | PASS |
|
|
|
ESC20-00249
| General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 10:47:04 AM | P | PASS |
|
|
Foundation has been poured, washout used. Backfill is right up to sidewalk, will need to see perimeter after they fill. No workers at site at time of inspection. Sunroc truck pulled in and was supposed to be meeting guys on site.
|
ESC19-00042
| Aging Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 9:30:45 AM | | PASS |
|
|
No washout dumped behind block. Section of alley has been sawcut. All units framed. Still some old slurry or paint washout next to port o pot.
|
ESC19-00634
| DOC - Permit Finaled | 5/11/2020 | 5/11/2020 | 5/11/2020 8:53:11 AM | P | PASS |
|
|
|
ESC19-00429