Inspections for the day of: Wednesday, May 16, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00471 Aging Inspection5/16/20185/16/20185/18/2018 3:15:28 PM PASS
No new work. Wattle along canal are starting to rot away.
ESC17-00654 General Inspection5/16/20185/16/20185/16/2018 2:43:00 PM FAIL
Something dark is still being washed out and dumped on ground. Sidewalk is stained from last improper washout.
ESC17-00954 Random Inspection5/16/20185/16/20185/16/2018 1:57:39 PMPPASS
Post rain inspection. Site is free from runoff or erosion issues. Knife River currently on site doing sewer/water work.
ESC17-00793 BMP Violation5/14/20185/16/20185/16/2018 12:59:46 PMANR
Street wasn't cleaned at time of inspection.
ESC17-01157 General Inspection5/16/20185/16/20185/16/2018 12:59:17 PMPPASS
ESC16-01512 General Inspection5/16/20185/16/20185/16/2018 12:59:04 PM PASS
Site nearly complete. Grass is growing on most exposed areas. Job trailer and most construction equipment is gone. Still a few workers finishing up.
ESC18-00497 General Inspection5/16/20185/16/20185/16/2018 12:54:10 PMPPASS
Site inspection and dewatering check.
Checked water coming in at property boundry,13.7 ntu, water leaving site measured 18.2 NTU. Dewatering operation working well. Canal is currently diverted as trunk goes through main channel, upon completion it will be redirected back into main channel.
No ESC issues at site.
ESC16-01037 Aging Inspection5/16/20185/16/20185/16/2018 12:09:35 PM PASS
Units in different stages of being built. South side is further along and cleaner. About half landscaped.
ESC16-01038 Aging Inspection5/16/20185/16/20185/16/2018 12:09:22 PM PASS
Units in different stages of being built. South side is further along and cleaner. About half landscaped.
ESC16-01039 Aging Inspection5/16/20185/16/20185/16/2018 12:09:09 PM PASS
Units in different stages of being built. South side is further along and cleaner. About half landscaped.
ESC17-00663 General Inspection5/16/20185/16/20185/16/2018 11:09:45 AM PASS
Site sale is pending. No ESC issues.
ESC18-00529 Site Preparation5/15/20185/16/20185/16/2018 10:58:55 AMAPASS
Met with Tom from Alta, did site walkthrough. He will talk to Syman to get a SWPPP & board on site, I left him some green permit signs. DIs are all protected, site will eventually be below sidewalk grade. Water wagon is on site, roads will need to be monitored for trackout, site has controlled access.
ESC17-00791 General Inspection5/16/20185/16/20185/16/2018 10:18:01 AMPPASS
Knife River on site doing work. Will follow up later this week.
ESC18-00107 Random Inspection5/16/20185/16/20185/16/2018 9:50:37 AMPPASS
Post rain inspection. No ESC issues.
ESC18-00109 Random Inspection5/16/20185/16/20185/16/2018 9:45:18 AMPPASS
Post rain event. No issues with site.