ESC17-01316
| General Inspection | 5/1/2018 | 5/17/2018 | 5/23/2018 2:33:24 PM | P | PASS |
|
|
Site fenced off and contained. Nothing leaving site, free from dust.
|
ESC17-00805
| General Inspection | 5/17/2018 | 5/17/2018 | 5/18/2018 2:54:54 PM | | PASS |
|
|
All work looks completed, no disturbance.
|
ESC17-00704
| General Inspection | 5/3/2018 | 5/17/2018 | 5/18/2018 1:33:58 PM | A | PASS |
|
|
Exterior work complete. Topsoil has been spread on lot. No one parking on lot, all workers using street parking.
|
ESC18-00107
| General Inspection | 5/15/2018 | 5/17/2018 | 5/18/2018 11:59:11 AM | P | PASS |
|
|
Follow up inspection. Wattle and gator guard installed on bottom of lot, gravel bag check dams installed. Sediment has been scraped and swept from intersection of Windsong. Sediment has stained pavement, looks much worse than it is, unable to scrape any more dirt off.
|
ESC17-00078
| General Inspection | 5/17/2018 | 5/17/2018 | 5/18/2018 11:50:50 AM | | PART |
|
|
Road, curb and gutters installed, no dirt leaving site. On site has lots of runoff onto roads. Inlets on north side are surrounded by sediment and need to be maintained. Site needs to be stabalized and perimeter protected if it is going to sit inactive.
|
ESC17-01672
| General Inspection | 5/10/2018 | 5/17/2018 | 5/18/2018 10:03:01 AM | P | PASS |
|
|
Talked to builder while on site. Installing witches hat on Roberts. Site and area are clean. Some dirt comes off site down apron and is being cleaned daily.
|
ESC17-00822
| Aging Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 2:10:47 PM | | PASS |
|
|
Work completed. Yard still needs landscaping and cleanup.
|
ESC18-00581
| General Inspection | 5/3/2018 | 5/17/2018 | 5/17/2018 2:10:45 PM | P | PASS |
|
|
SWPPP sign and broom at entrance.Met with builder, no issues from rain event.
|
ESC16-00406
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 12:25:57 PM | P | PASS |
|
|
post rainfall inspection. No issues on site, builders taking care of their own lots. DIs are getting full, they started to pull and clean them while I was on site.
|
ESC16-01682
| Site Final | 5/16/2018 | 5/17/2018 | 5/17/2018 11:59:12 AM | P | PASS |
|
|
|
ESC17-00954
| Random Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 11:54:55 AM | P | PASS |
|
|
Post rain inpsection. No runoff from site. No issues on site.
|
ESC16-01395
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 11:45:38 AM | | PASS |
|
|
No new exterior work.
|
ESC17-00842
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 11:29:22 AM | P | PASS |
|
|
post rain inspection Some sediment has made it past wattle and onto sidewalk on upper end of project. Previously requested corrections not yet complete.
|
ESC17-00302
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 11:10:03 AM | P | PART |
|
|
post rainfall inspection. Perimeter wattle installed along bottom of hill. Some dirt in gutter out front, I traced it coming from above, behind "The Villa" gate. No stucco washout, being dumped on hill and running towards road. No hillside rilling.
|
ESC17-01287
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 10:50:26 AM | P | PASS |
|
|
Silt fence installed on downhill side of project, permit displayed. Storing backfill on vacant lot across the street, have owners permission. After reusing backfill remainder will be graded on lot. No runoff from site.
|
ESC16-00955
| General Inspection | 5/1/2018 | 5/17/2018 | 5/17/2018 10:37:58 AM | P | PASS |
|
|
No runoff. Site still needs landscaping. Gator guard has a lot of sediment building up behind it.
|
ESC17-00227
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 10:23:18 AM | P | PASS |
|
|
Pavement Specialties on site to pave driveway. Hillside is in good condition, BMPs are in place.
|
ESC17-00625
| General Inspection | 4/30/2018 | 5/17/2018 | 5/17/2018 10:07:38 AM | A | PART |
|
|
Curb, gutters, sidewalk, and road complete. Lots of trackout on site, was noted in Swppp inspection. No dirt leaving site. Sweeper attatchment on site.
|
ESC15-00504
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 9:50:50 AM | | PASS |
|
|
Job trailer has been removed. Site is nearing final stabalization and almost completed.
|
ESC17-01479
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 9:43:03 AM | P | PASS |
|
|
Crew on site installing forms for sidewalks. Curbing in place, no concrete washout on site, no signs of washout dumped on ground. No ESC issues, site is dry.
|
ESC17-01196
| General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 9:15:22 AM | P | PART |
|
|
post rainfall inspection. No runoff or erosion issues. Silt fence on south is destroyed, silt fence on west is under load.
|