Inspections for the day of: Monday, May 18, 2020.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01432 General Inspection5/18/20205/18/20205/19/2020 1:49:42 PM PEND
Sent RP message to come and remove inlet protection so permit can be closed.
Talked to RP, scheduled for final 5/22
ESC18-00983 General Inspection5/18/20205/18/20205/19/2020 11:37:53 AM PASS
All foundation on Mendota poured, few homes framed, workers on interior.
Workers are all parked on Mendota, no trash or tracking.
Hillsides above and below Rutbie have good vegetative cover.
No activity on Danzee.
All foundations on south of Tiger Lilly completed, preppin to pour pads on north side. Washout still in garage.
No issues.
ESC18-00179 General Inspection5/18/20205/18/20205/19/2020 10:41:09 AM PASS
Few pieces of home wrap were blown into creek, I cleaned them up.
All foundations are poured, crews are working on framing. Multiple trash boxes, site is clean. All parking areas are completed, no one driving in mud. Landscapers are working at completed homes.
No ESC issues at site.
ESC18-01504 General Inspection5/18/20205/18/20205/19/2020 9:55:02 AM PASS
No new activity. Some pallets being stored on site.
ESC18-00371 Site Final5/18/20205/18/20205/18/2020 1:37:11 PMPPASS
WIP on interior. Lot is landscaped and stable.
ESC16-00353 General Inspection5/18/20205/18/20205/18/2020 1:29:41 PM PASS
Area stable, no new home construction.
ESC19-00034 General Inspection5/18/20205/18/20205/18/2020 11:55:01 AM PASS
WIP on framing. All material on parking lot, trash contained. Area around building starting to regrow.
ESC20-00055 General Inspection5/18/20205/18/20205/18/2020 11:03:52 AMPPASS
Site has good vegetation cover. Canal was repaired and flowing, new head gate installed.
ESC19-00157 General Inspection5/18/20205/18/20205/18/2020 10:43:23 AM PASS
Site is now gated, clean and contained.
ESC19-01767 General Inspection5/13/20205/18/20205/18/2020 10:42:56 AMPPASS
Small crew on site setting forms and rebar. Spoke with PM, washout pans will be replaced day before pour.
Also left them a permit sign.
ESC18-00899 Aging Inspection5/18/20205/18/20205/18/2020 10:07:31 AM PASS
All homes completed and lots landscaped. Site still has Di bags at Cannel Island and a port o pot.
ESC19-01177 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:48 AMPPASS
ESC19-01109 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:41 AMPPASS
ESC19-01259 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:35 AMPPASS
ESC19-01439 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:29 AMPPASS
ESC19-01660 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:22 AMPPASS
ESC19-01346 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:15 AMPPASS
ESC19-01147 DOC - Permit Finaled5/18/20205/18/20205/18/2020 10:06:01 AMPPASS
ESC19-00376 General Inspection5/18/20205/18/20205/18/2020 9:44:32 AMPPASS
No work on north side of infill. 3 completed homes, 2 under construction. Area is clean, no issues.
ESC19-01493 Site Final5/18/20205/18/20205/18/2020 9:43:32 AMPPASS
ESC19-01414 Site Final5/18/20205/18/20205/18/2020 9:43:13 AMPPASS
ESC19-01329 Site Final5/18/20205/18/20205/18/2020 9:42:59 AMPPASS
ESC18-01045 Aging Inspection5/18/20205/18/20205/18/2020 9:32:32 AM PASS