ESC18-01432
| General Inspection | 5/18/2020 | 5/18/2020 | 5/19/2020 1:49:42 PM | | PEND |
|
|
Sent RP message to come and remove inlet protection so permit can be closed. Talked to RP, scheduled for final 5/22
|
ESC18-00983
| General Inspection | 5/18/2020 | 5/18/2020 | 5/19/2020 11:37:53 AM | | PASS |
|
|
All foundation on Mendota poured, few homes framed, workers on interior. Workers are all parked on Mendota, no trash or tracking. Hillsides above and below Rutbie have good vegetative cover. No activity on Danzee. All foundations on south of Tiger Lilly completed, preppin to pour pads on north side. Washout still in garage. No issues.
|
ESC18-00179
| General Inspection | 5/18/2020 | 5/18/2020 | 5/19/2020 10:41:09 AM | | PASS |
|
|
Few pieces of home wrap were blown into creek, I cleaned them up. All foundations are poured, crews are working on framing. Multiple trash boxes, site is clean. All parking areas are completed, no one driving in mud. Landscapers are working at completed homes. No ESC issues at site.
|
ESC18-01504
| General Inspection | 5/18/2020 | 5/18/2020 | 5/19/2020 9:55:02 AM | | PASS |
|
|
No new activity. Some pallets being stored on site.
|
ESC18-00371
| Site Final | 5/18/2020 | 5/18/2020 | 5/18/2020 1:37:11 PM | P | PASS |
|
|
WIP on interior. Lot is landscaped and stable.
|
ESC16-00353
| General Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 1:29:41 PM | | PASS |
|
|
Area stable, no new home construction.
|
ESC19-00034
| General Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 11:55:01 AM | | PASS |
|
|
WIP on framing. All material on parking lot, trash contained. Area around building starting to regrow.
|
ESC20-00055
| General Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 11:03:52 AM | P | PASS |
|
|
Site has good vegetation cover. Canal was repaired and flowing, new head gate installed.
|
ESC19-00157
| General Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 10:43:23 AM | | PASS |
|
|
Site is now gated, clean and contained.
|
ESC19-01767
| General Inspection | 5/13/2020 | 5/18/2020 | 5/18/2020 10:42:56 AM | P | PASS |
|
|
Small crew on site setting forms and rebar. Spoke with PM, washout pans will be replaced day before pour. Also left them a permit sign.
|
ESC18-00899
| Aging Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 10:07:31 AM | | PASS |
|
|
All homes completed and lots landscaped. Site still has Di bags at Cannel Island and a port o pot.
|
ESC19-01177
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:48 AM | P | PASS |
|
|
|
ESC19-01109
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:41 AM | P | PASS |
|
|
|
ESC19-01259
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:35 AM | P | PASS |
|
|
|
ESC19-01439
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:29 AM | P | PASS |
|
|
|
ESC19-01660
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:22 AM | P | PASS |
|
|
|
ESC19-01346
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:15 AM | P | PASS |
|
|
|
ESC19-01147
| DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 10:06:01 AM | P | PASS |
|
|
|
ESC19-00376
| General Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 9:44:32 AM | P | PASS |
|
|
No work on north side of infill. 3 completed homes, 2 under construction. Area is clean, no issues.
|
ESC19-01493
| Site Final | 5/18/2020 | 5/18/2020 | 5/18/2020 9:43:32 AM | P | PASS |
|
|
|
ESC19-01414
| Site Final | 5/18/2020 | 5/18/2020 | 5/18/2020 9:43:13 AM | P | PASS |
|
|
|
ESC19-01329
| Site Final | 5/18/2020 | 5/18/2020 | 5/18/2020 9:42:59 AM | P | PASS |
|
|
|
ESC18-01045
| Aging Inspection | 5/18/2020 | 5/18/2020 | 5/18/2020 9:32:32 AM | | PASS |
|
|
|