Inspections for the day of: Tuesday, May 19, 2020.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00275 Aging Inspection5/19/20205/19/20205/19/2020 1:48:38 PM CANC
ESC19-00275 DOC - Permit Finaled5/19/20205/19/20205/19/2020 1:48:31 PMPPASS
ESC19-00366 Aging Inspection5/19/20205/19/20205/19/2020 1:42:03 PM PASS
Home is tyvek wrapped.
Lot is grown and stable.
ESC19-00064 Aging Inspection5/19/20205/19/20205/19/2020 1:35:46 PM PASS
Home framed and tyvek wrapped. Lot isn't landscaped but is stable.
ESC18-01576 General Inspection5/19/20205/19/20205/19/2020 1:35:17 PM PASS
Site has stabilization bond, will final when stable.
ESC19-00714 General Inspection5/6/20205/19/20205/19/2020 12:07:10 PMAPASS
Work are is fenced off from rest off job. No trash or debris behind units. All workers parked on pavement. All units framed, most exterior work completed.
No issues at site.
ESC20-00456 Site Preparation5/18/20205/19/20205/19/2020 11:58:30 AMPPASS
Work has begun on site cleanup. No disturbance, old home not demoed.
No permit sign, no post to put one.
ESC18-00164 General Inspection5/19/20205/19/20205/19/2020 11:45:37 AM PASS
No new activity, no issues.
ESC20-00139 General Inspection5/19/20205/19/20205/19/2020 11:14:42 AMPPASS
WIP on framing. All workers parked on concrete drive. Trash contained, wood scraps all in box. Washout spilled from pan has been cleaned.
ESC19-00012 Aging Inspection5/19/20205/19/20205/19/2020 11:06:17 AM CANC
ESC19-00324 General Inspection5/19/20205/19/20205/19/2020 11:05:40 AM PASS
No activity on any building lots. Hillside is starting to grow well, berm still located near corner.
Sidewalk along warm springs has been poured.
Crew working on sidewalk excavation along Teresa. Still some heavy equipment, lift station not in.
No issues at site at time of inspection.
ESC19-01130 Site Final5/19/20205/19/20205/19/2020 10:27:45 AMPPASS
ESC19-01082 Site Final5/19/20205/19/20205/19/2020 10:27:19 AMPPASS
ESC18-00488 General Inspection5/19/20205/19/20205/19/2020 10:13:39 AMPPASS
Western most blocks are all completed. All foundations have already been poured. Few workers at site. Some backfill stored at site. No esc issues.
ESC19-00939 Site Final5/19/20205/19/20205/19/2020 10:11:45 AMPPASS
ESC19-00991 Site Final5/19/20205/19/20205/19/2020 10:11:32 AMPPASS
ESC19-00918 Site Final5/19/20205/19/20205/19/2020 10:11:20 AMPPASS
ESC19-00525 General Inspection5/19/20205/19/20205/19/2020 9:44:22 AM PASS
Site is all contained. Some vertical residential has begun, still doing prep works on other units. Plan to store materials in garage once building under way.
No issues.