Inspections for the day of: Wednesday, May 2, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00700 General Inspection5/2/20185/2/20185/3/2018 11:35:05 AM PASS
All facade work contained within fenced perimeter. Tarps are under areas where plaster is being used.
Staging area located in parking lot.
ESC17-01376 General Inspection5/2/20185/2/20185/2/2018 2:31:31 PMPPASS
Exterior of home and garage nearly completed. No dirt is leaving lot. Sidewalk and road are clean.
ESC18-00264 General Inspection5/2/20185/2/20185/2/2018 2:23:48 PMPPASS
Retaining wall in place, driveway and landscaping started. Concern of runoff if we have large rain event, soil is sandy and very loose. Trench along perimeter should intercept any runoff, driveway may act as channel.
ESC16-01395 General Inspection5/2/20185/2/20185/2/2018 1:56:24 PM PASS
New owners focusing on interior and making house livable before dealing with yard. No changes and no issues.
ESC17-00693 General Inspection5/2/20185/2/20185/2/2018 12:34:29 PM FAIL
Rilling still in front, wattles have failed and sand is on sidewalk.
Concrete, paint, and stucco washed out in back corner of lot and also in front corner.
Second failure for same issues, sending written request to RP and will follow up 5-9. Will put inspection hold on parcel if site not cleaned.
ESC15-00853 General Inspection5/2/20185/2/20185/2/2018 12:06:51 PM PART
WIP.
IMC on site, washed out onto ground even though a washout box is down the hill.
Upper witches hats starting to fill up.
ESC18-00349 General Inspection5/2/20185/2/20185/2/2018 11:48:33 AMPPASS
Currently prepping 34th street for paving.
Some dirt on Breneman, areas have been saw cut and need to be patched.
Site is rough graded and exposed, no new work has begun. Site will need to be monitored for dust and trackout.
ESC17-00941 Aging Inspection5/2/20185/2/20185/2/2018 11:29:24 AM CANC
ESC17-00941 DOC - Permit Finaled5/2/20185/2/20185/2/2018 11:29:15 AMPPASS
ESC18-00576 Conference5/2/20185/2/20185/2/2018 11:07:44 AMPPASS
Called in by John Craft with HC Company, site walkthrough.
BMPs installed. Project is in rear, large parking lot seperates work from McMillan. Water truck on site. Let foreman know to watch out for trackout and dust. Project area is currently below grade, material for subgrade will be brought in and installed. All SWPPP info located in job trailer. Project is only anticipated to last 3 weeks.
ESC17-01517 General Inspection5/2/20185/2/20185/2/2018 10:26:48 AMPPASS
WIP on addition. Site contained, some building waste is piled in front of home.
ESC17-00936 General Inspection5/2/20185/2/20185/2/2018 10:20:36 AMPPEND
Some building material on site that needs to be cleaned and disposed. Currently working on framing and installing curbing on perimeter.
Syman SWPPP reports don't seem to be meeting the 14 day set in SWPPP or are not being put in completed inspection section. Rainfall triggered inspections completed, if changing to monthly and rain triggered SWPPP needs to be updated.
ESC17-00404 General Inspection5/2/20185/2/20185/2/2018 10:00:08 AMPPASS
Site dirt work and landscaping complete. Currently working on brick facade and interior. Talked to foreman, they are cleaning area as they go, keeping plastic sheeting and styrofoam backer from blowing away. Mortar and stucco is being cleaned from ground as brick work is finished. Multiple dumpsters on site.
ESC17-00011 General Inspection5/2/20185/2/20185/2/2018 9:59:48 AMPPASS
Site dirt work and landscaping complete. Currently working on brick facade and interior. Talked to foreman, they are cleaning area as they go, keeping plastic sheeting and styrofoam backer from blowing away. Mortar and stucco is being cleaned from ground as brick work is finished. Multiple dumpsters on site.
ESC17-00422 General Inspection5/2/20185/2/20185/2/2018 9:31:37 AMPPASS
Perimeter controls and entrance in place. No dirt is leaving site. Mortar mixer is in secondary containment. No issues with site.