ESC18-00659
| General Inspection | 5/2/2019 | 5/2/2019 | 5/3/2019 10:31:39 AM | P | PASS |
|
|
Stockpile is starting to be overgrown. Paving of main road completed, north parking lot also paved. Site gets trash cleaned up end of day.
|
ESC18-00983
| Tracking Control | 4/30/2019 | 5/2/2019 | 5/2/2019 2:40:41 PM | A | PASS |
|
|
Entrances have been closed, area is prepped for paving. Road has been cleaned.
|
ESC18-00293
| Aging Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 2:28:46 PM | | PASS |
|
|
Home is framed. Shered trash in both front and rear. Lumber scraps are in a pile between homes. Nothing leaving lot.
|
ESC18-00277
| Aging Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 2:28:34 PM | | PASS |
|
|
Home is framed. Shered trash in both front and rear. Lumber scraps are in a pile between homes. Nothing leaving lot.
|
ESC19-00178
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 2:13:41 PM | P | PASS |
|
|
Crew putting backfill back in foundation. Two kiddie pool washouts on site. No ESC issues.
|
ESC16-00225
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 2:04:43 PM | | PASS |
|
|
No new lot or home activity. No new equipment staged at next phase.
|
ESC17-01749
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 2:02:15 PM | | PART |
|
|
Home completed, sprinkler company on site, still needs landscaping. Large pile of trash out front that needs to be picked up, dirt ramp in road going onto sidewalk. Follow up scheduled for next week.
|
ESC18-00110
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 1:59:50 PM | | PASS |
|
|
Site is clean and contained. No landscaping or stabalization begun.
|
ESC18-00141
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 1:24:47 PM | | PASS |
|
|
Site clean and contained.
|
ESC18-00773
| Aging Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 12:11:30 PM | | PASS |
|
|
Home completed, still needs landscaping.
|
ESC18-00031
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 12:02:26 PM | P | PASS |
|
|
Sand for seepage beds stored on parking lot. Trash needs to be picked up soon, contained in pikles but getting large.
|
ESC18-00749
| Aging Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 11:58:50 AM | | PASS |
|
|
Homes are completed, still need landscaping.
|
ESC18-01273
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 11:45:47 AM | P | PASS |
|
|
Washout on site. Rear hill has been tracked. Tilt up building has walls up, trusses on site. No issues.
|
ESC18-01131
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 11:44:38 AM | P | PASS |
|
|
Site is being prepped for paving, scheduled for 5/8. Landscapers will start removing silt fence as it is in their way. Curbing has been installed, ecopan on site.
|
ESC16-01027
| Site Final | 5/2/2019 | 5/2/2019 | 5/2/2019 11:11:09 AM | P | NR |
|
|
staging area clean and temp BMPs removed? Still old washout and loose building waste laying around.
|
ESC18-01444
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 10:52:47 AM | P | PEND |
|
|
Spoke with Tim the RP while on site. Has Curtis scheduled to sweep this afternoon. Will check DIs and clean aprons. Will be moving to East entrance starting on Monday. Will check site next week.
|
ESC18-01674
| General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 10:06:32 AM | P | PASS |
|
|
Site stripped, seepage pit awaiting inspection. Only concerns currently are blown dust and trackout. Gave foreman green sign,filled out and in window.
|