ESC18-00014
| General Inspection | 5/18/2018 | 5/21/2018 | 5/23/2018 11:22:09 AM | P | PASS |
|
|
check site. Started w/o site prep. Left grass buffer and are working below grade, made field level change to omit wattle. Entrance is onto paved area, bringing sweeper as needed. Waiting for Suez and Idaho Power to move utilities so entrances can be constructed in their final spots. DIs have filter fabric, I asked for witches hats with overflow protection. Washout on site.
|
ESC18-00507
| General Inspection | 5/16/2018 | 5/21/2018 | 5/23/2018 10:01:38 AM | P | PASS |
|
|
Surveyor on site. No work has begun.
|
ESC15-00306
| General Inspection | 5/21/2018 | 5/21/2018 | 5/22/2018 1:41:19 PM | | PASS |
|
|
No new work. Bathroom complete, permit finalled.
|
ESC17-00010
| General Inspection | 5/21/2018 | 5/21/2018 | 5/22/2018 11:41:53 AM | | CANC |
|
|
|
ESC17-00513
| General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 3:24:28 PM | | PASS |
|
|
Met with project manager on site. Site is in good condition. Only correction request was to turn and freshen rock on entrance and to make sure drivers are not going around it.
|
ESC18-00440
| Random Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 2:14:32 PM | P | FAIL |
|
|
Lots of trackout from excavator on road. Left message with RP Mark
|
ESC17-00076
| Aging Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 2:11:19 PM | | PASS |
|
|
Will final when building permit closed.
|
ESC15-01210
| General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 1:09:45 PM | | PART |
|
|
ZFirst lot and last lot on left have some runoff onto sidewalk. Pool on top right causing trackout.
|
ESC17-00321
| Aging Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 12:53:08 PM | | PASS |
|
|
WIP. Most of disturbed area has grown over.
|
ESC16-00968
| Aging Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 12:49:34 PM | | PASS |
|
|
New pad poured for garage. No dirt leaving site, free of trash.
|
ESC15-00976
| General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 12:43:03 PM | | PASS |
|
|
All work contained. Working on prep to fram garages.
|
ESC16-00290
| Aging Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 12:31:24 PM | | CANC |
|
|
|
ESC16-01278
| General Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 12:09:30 PM | | PART |
|
|
Lots of dirt on Annett. Few homes completed and landscaped. Most of site is clean.
|
ESC18-00179
| Site Preparation | 5/18/2018 | 5/21/2018 | 5/21/2018 11:47:29 AM | A | PASS |
|
|
10 AM precon Work on getting ends of new creek opened up. 404 permit issued. No fill in work until new plans are approved.
|
ESC17-00774
| General Inspection | 5/15/2018 | 5/21/2018 | 5/21/2018 11:46:44 AM | A | PASS |
|
|
follow up Knife river is going to fix rill forming. No issues on site, BMPs still in place.
|
ESC17-00793
| Random Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 9:44:14 AM | P | PART |
|
|
Some sediment accumulated at bottom of hill. RP was already at site.
|
ESC17-00791
| Random Inspection | 5/21/2018 | 5/21/2018 | 5/21/2018 9:42:53 AM | P | PASS |
|
|
No major issues from rain event. Some rilling has undercut the wattles in places around perimeter drain.
|