ESC18-00592
| Site Final | 5/23/2019 | 5/29/2019 | 5/31/2019 10:34:44 AM | P | PASS |
|
|
|
ESC19-00260
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 3:19:16 PM | P | PASS |
|
|
Excavator on site, no dirt has left site, BMPs in good shape. Will need to haul out back fill after basement is dug.
|
ESC19-00517
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 3:11:28 PM | P | PASS |
|
|
Wattle on downhill slopw of acess road, larg natural buffer.
|
ESC19-00371
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 2:59:45 PM | P | PASS |
|
|
Silt fence has been repaired where it wasn't trenched. DIversion added to road to deflect stormwater into vegetation. Silt fence added below road to catch any water flow, wattle added below to catch additional sediment and water as needed. Graded areas on hill have been tracked and wattle installed.
|
ESC17-00791
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 2:37:35 PM | P | FAIL |
|
|
Blow out into neighbors yard. RP notified follow up scheduled.
|
ESC18-00845
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 2:29:51 PM | P | PASS |
|
|
Sprinklers done, hasn't been hydroseeded.
|
ESC18-01576
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 1:06:37 PM | P | PASS |
|
|
Soil absorbed all water. No runoff down hill.
|
ESC16-00353
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 12:55:17 PM | P | PASS |
|
|
No major ESC issues, lots were able to hold the water.
|
ESC18-00498
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 12:42:58 PM | P | PEND |
|
|
Met with RP. Some sand on sidewalks, will add wattle. Access road to pond has rilling, thinking of adding riprap channel.
|
ESC16-00406
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 12:25:54 PM | P | PEND |
|
|
Area around inlets needs sediment cleaned. Some runoff onto golf cart path. Specialty Supply on site with new wattles.
|
ESC18-00946
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 12:04:06 PM | P | PASS |
|
|
No failures. Water conveyance system working, no new rilling. No sediment runoff, buildup behing wattles is getting high.
|
ESC17-00190
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 11:52:17 AM | P | PART |
|
|
post rain inspection. Identify lots with most erosion/runoff so we can notify the developer/RP. Message sent to RP. Storm system starting to fill with sediment. Witches hat between homes is full. Watlle has been run over a lot and not working so well. Some sediment run on on road and sidewalks.
|
ESC18-01719
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 11:26:00 AM | P | PASS |
|
|
No runoff, only disturbed area is where foundation was.
|
ESC17-00954
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 11:07:38 AM | P | PASS |
|
|
post rain inspection ACHD sweeper working on Winsome. Neighborhood snake bags need sediment cleaned and destroyed ones should be thrown away. First lot on left holding water. Talked to RPs about issues on their own lots. No major issues with anything in neighborhood.
|
ESC18-01531
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 10:22:01 AM | P | PASS |
|
|
post rain inspection Syman crew on site replacing inlet protection. Poly installed to catch water from roof and direct below home, silt fence catching flow. Silt fence with J-hook along front. Side lot is vacant and has some vegetation.
|
ESC18-01284
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 10:08:32 AM | P | PASS |
|
|
Some building material stored in road. Front lot is pitrun. No ESC issues, no runoff going down hill.
|
ESC17-01287
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 10:02:30 AM | P | PASS |
|
|
post rain inspection No failures or washouts onto road. Crew on site working on forms for front steps. Pump driver dumped all the first bunch of mud on lower landing, big pile of concrete but is stable, no illicit washout.
|
ESC15-00857
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:51:23 AM | P | PASS |
|
|
check on any hillside springs or drainage erosion on Bent Bow, 50 ft up from storm drain at Arrow Villa No visible discharge, wet spots on road or sidewalk, or flows from hillside. No signs of road or sidewalk failure.
|
ESC18-01022
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:36:19 AM | P | PASS |
|
|
No water made it to pond, all absorbed by growing hillside vegetation. No major issues at site.
|
ESC19-00556
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:34:25 AM | P | PASS |
|
|
BMPs installed, no workers on site.
|
ESC18-00928
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:33:16 AM | P | PASS |
|
|
Spoke with stucco contractor and PJ. Will get stucco washout pit dug before work. No ESC issues.
|
ESC18-00738
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:32:05 AM | P | PASS |
|
|
Home completed and lot landscaped. Old silt fence still laying on ground and will need to be cleaned.
|
ESC18-00737
| General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 9:31:20 AM | P | PASS |
|
|
Home exterior completed and lot landscaped. Steep area in front and side of home seeded.
|