Inspections for the day of: Thursday, May 3, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01472 General Inspection5/3/20185/3/20185/3/2018 2:08:40 PM PASS
Work on vertical construction. Workers parking off site. No dust or trackout.
ESC16-01457 General Inspection5/3/20185/3/20185/3/2018 1:57:07 PM PASS
Still in process of stabalizing.
ESC17-01712 Site Final5/3/20185/3/20185/3/2018 1:19:13 PMPPASS
ESC16-01588 Site Final5/3/20185/3/20185/3/2018 1:19:03 PMPPASS
ESC18-00467 General Inspection5/3/20185/3/20185/3/2018 12:22:21 PMPPASS
Starting with interior work on existing buildings. Still a while out before they do any dirt work.
ESC16-01651 General Inspection5/3/20185/3/20185/3/2018 12:05:24 PMPPART
Drain inlet protection is getting full and needs to be maintained. All foundations have been poured, concrete washout has been removed. Paint and/or stucco is being washed onto ground.
ESC17-01322 General Inspection5/3/20185/3/20185/3/2018 11:51:32 AMPPASS
WIP on interior. Lot is still bare, street and sidewalk clean.
ESC17-01124 General Inspection5/3/20185/3/20185/3/2018 11:50:54 AMPCANC
ESC17-01124 DOC - Permit Finaled5/3/20185/3/20185/3/2018 11:50:48 AMPPASS
ESC15-01420 Site Final5/3/20185/3/20185/3/2018 11:50:28 AMPNR
One home still under construction and one lot still vacant and not stabalized.
ESC18-00063 Site Preparation5/3/20185/3/20185/3/2018 11:00:09 AMPPASS
Perimeter BMPs in place. Construction entrance with geotextile liner in place. Grading has begun.
ESC17-01117 Site Preparation5/2/20185/3/20185/3/2018 10:53:01 AMPPASS
Tony Phone #: ###-####
Work area is in existing parking lot. Inlets are protected, area is kept clean.
ESC18-00503 Site Preparation5/2/20185/3/20185/3/2018 9:54:47 AMAPASS
Kelly Phone #: ###-####
Ready for excavation. Will install entrance after utilities are ran, will be in drive and doesn't want to destroy entrance before it is used. Backfill to be stored on site, washout will be constructed when concrete is poured.
ESC17-00951 Aging Inspection5/3/20185/3/20185/3/2018 9:20:25 AM CANC
ESC17-00951 DOC - Permit Finaled5/3/20185/3/20185/3/2018 9:20:09 AMPPASS
ESC17-00358 General Inspection5/3/20185/3/20185/3/2018 8:35:09 AM CANC