Inspections for the day of: Wednesday, May 30, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00349 General Inspection5/16/20185/30/20185/31/2018 12:01:56 PMPPASS
Track utilities on site. No dirt leaving lot. 34th street is now paved and completed.
ESC18-00177 General Inspection5/30/20185/30/20185/30/2018 3:48:43 PMPPASS
Starting to remove vegetation and prep area to fill old creek channel. Water truck on site, no dust leaving site.
ESC18-00497 General Inspection5/30/20185/30/20185/30/2018 3:10:32 PMPPART
Water at outlet was reading 50-150 NTU depending which side of outlet was tested, visible plume. Water below last hose was 10.5 NTU. Hoses were directed for overland flow while I was on site, no way to know for sure how long there was a high turbidity dfischarge. Corrective actions were taken and discharge was clearing up while on site.
ESC16-01512 Site Final5/30/20185/30/20185/30/2018 2:37:40 PMPPASS
ESC16-00489 General Inspection5/30/20185/30/20185/30/2018 12:38:37 PM PASS
Phase nearly complete, few homes remain under construction. No building waste or trackout on site. Landscapers at site, storing material in road.
ESC17-01362 General Inspection5/30/20185/30/20185/30/2018 12:28:47 PMPPASS
Currently no dewatering. Two hookups renmain, anticipated to start dewatering again on 6-4. No dust or trackout from site.
ESC15-01579 General Inspection5/29/20185/30/20185/30/2018 12:08:44 PMAPASS
Work nearly completed. Landscapers are now on the south side of project. Area between river and apartments is still all disturbed. Some trash still along greenbelt.
ESC16-01561 General Inspection5/30/20185/30/20185/30/2018 11:50:33 AM PART
Wattle has been installed on east end protecting wetlands. Still lots of trash scattered around building sites. Some trackout onto interior roads. Homes on western edge have lots of lumber waste and are storing material all over grounds. Hunter home washouts are nearly full, washout on north side of project is almost full.
ESC17-00324 Aging Inspection5/30/20185/30/20185/30/2018 10:57:36 AM CANC
ESC17-00324 DOC - Permit Finaled5/30/20185/30/20185/30/2018 10:57:27 AMPPASS
ESC17-00649 General Inspection5/30/20185/30/20185/30/2018 10:56:04 AM PASS
Home is prepped for stucco, work hasn't begun an install.
ESC17-00504 General Inspection5/30/20185/30/20185/30/2018 10:47:06 AM PASS
Exterior work and landscaping complete.
ESC17-00505 General Inspection5/30/20185/30/20185/30/2018 10:46:51 AM PASS
Exterior work and landscaping complete.
ESC17-00800 Site Final5/29/20185/30/20185/30/2018 10:28:02 AMPPASS
ESC16-00225 General Inspection5/30/20185/30/20185/30/2018 10:16:03 AM PASS
No ESC issues on upper boulder heights. WIP on two homes.
ESC17-00791 General Inspection5/30/20185/30/20185/30/2018 10:06:30 AMPPASS
No failures after weekend rain event. Wattle will need to be maintained, you can see light under it in places.
Crew on site with excavator doing work on drainage along perimeter.
ESC17-00334 General Inspection5/30/20185/30/20185/30/2018 8:46:30 AM PASS