PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, May 30, 2018
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Michael Zawacki
Title
EROSION INSPECTOR
Phone #
208-473-8333
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00349
General Inspection
5/16/2018
5/30/2018
5/31/2018 12:01:56 PM
P
PASS
Track utilities on site. No dirt leaving lot. 34th street is now paved and completed.
ESC18-00177
General Inspection
5/30/2018
5/30/2018
5/30/2018 3:48:43 PM
P
PASS
Starting to remove vegetation and prep area to fill old creek channel. Water truck on site, no dust leaving site.
ESC18-00497
General Inspection
5/30/2018
5/30/2018
5/30/2018 3:10:32 PM
P
PART
Water at outlet was reading 50-150 NTU depending which side of outlet was tested, visible plume. Water below last hose was 10.5 NTU. Hoses were directed for overland flow while I was on site, no way to know for sure how long there was a high turbidity dfischarge. Corrective actions were taken and discharge was clearing up while on site.
ESC16-01512
Site Final
5/30/2018
5/30/2018
5/30/2018 2:37:40 PM
P
PASS
ESC16-00489
General Inspection
5/30/2018
5/30/2018
5/30/2018 12:38:37 PM
PASS
Phase nearly complete, few homes remain under construction. No building waste or trackout on site. Landscapers at site, storing material in road.
ESC17-01362
General Inspection
5/30/2018
5/30/2018
5/30/2018 12:28:47 PM
P
PASS
Currently no dewatering. Two hookups renmain, anticipated to start dewatering again on 6-4. No dust or trackout from site.
ESC15-01579
General Inspection
5/29/2018
5/30/2018
5/30/2018 12:08:44 PM
A
PASS
Work nearly completed. Landscapers are now on the south side of project. Area between river and apartments is still all disturbed. Some trash still along greenbelt.
ESC16-01561
General Inspection
5/30/2018
5/30/2018
5/30/2018 11:50:33 AM
PART
Wattle has been installed on east end protecting wetlands. Still lots of trash scattered around building sites. Some trackout onto interior roads. Homes on western edge have lots of lumber waste and are storing material all over grounds. Hunter home washouts are nearly full, washout on north side of project is almost full.
ESC17-00324
Aging Inspection
5/30/2018
5/30/2018
5/30/2018 10:57:36 AM
CANC
ESC17-00324
DOC - Permit Finaled
5/30/2018
5/30/2018
5/30/2018 10:57:27 AM
P
PASS
ESC17-00649
General Inspection
5/30/2018
5/30/2018
5/30/2018 10:56:04 AM
PASS
Home is prepped for stucco, work hasn't begun an install.
ESC17-00504
General Inspection
5/30/2018
5/30/2018
5/30/2018 10:47:06 AM
PASS
Exterior work and landscaping complete.
ESC17-00505
General Inspection
5/30/2018
5/30/2018
5/30/2018 10:46:51 AM
PASS
Exterior work and landscaping complete.
ESC17-00800
Site Final
5/29/2018
5/30/2018
5/30/2018 10:28:02 AM
P
PASS
ESC16-00225
General Inspection
5/30/2018
5/30/2018
5/30/2018 10:16:03 AM
PASS
No ESC issues on upper boulder heights. WIP on two homes.
ESC17-00791
General Inspection
5/30/2018
5/30/2018
5/30/2018 10:06:30 AM
P
PASS
No failures after weekend rain event. Wattle will need to be maintained, you can see light under it in places.
Crew on site with excavator doing work on drainage along perimeter.
ESC17-00334
General Inspection
5/30/2018
5/30/2018
5/30/2018 8:46:30 AM
PASS