ESC14-01063
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:47:05 PM | P | PART |
|
|
Post Rain Inspection. No runoff or BMP failure on site.
|
ESC15-00857
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:46:55 PM | P | PASS |
|
|
Post Rain Inspection. No runoff or BMP failure on site.
|
ESC17-00836
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:17:59 PM | P | PASS |
|
|
Rock Placing Company on site. No ESC issues.
|
ESC15-01210
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:16:07 PM | P | PART |
|
|
Area was hit hard by storm. Most lots have already been cleaned or cleaning is in progress. Second lot on left and last vacant lot on left both have runoff and haven't been cleaned.
|
ESC18-00171
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:11:03 PM | P | PASS |
|
|
Silt fence held all water and sediment. No issues on site. Foundation work in progress, washout on site.
|
ESC18-00264
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 3:09:32 PM | P | PEND |
|
|
Owner on site. There was a washout from driveway down road. Was being cleaned while on site. Owner will update BMPs and get everything clean before end of day.
|
ESC18-00011
| General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 2:17:22 PM | P | PASS |
|
|
WIP. BMPs still in place and site clean. No ESC issues.
|
ESC17-00654
| General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 2:06:00 PM | | PEND |
|
|
Runoff from site, sand at bottom of hill.
|
ESC17-00542
| Site Final | 5/30/2018 | 5/31/2018 | 5/31/2018 1:13:41 PM | A | PASS |
|
|
|
ESC17-01125
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 1:04:29 PM | P | PEND |
|
|
Rilling on hill, dirt running down sidewalk. Talked to RP and he will get it fixed.
|
ESC18-00503
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 12:57:48 PM | P | PEND |
|
|
Water is following silt fence and spilling onto sidewalk. Called RP and left a message.
|
ESC17-01057
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 12:44:47 PM | P | PASS |
|
|
WIP. Using vacant lot next door for storage and access.
|
ESC17-01102
| Aging Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 11:56:44 AM | | PASS |
|
|
|
ESC18-00451
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 11:42:21 AM | P | PASS |
|
|
Site is muddy, workers parking on street. No esc issues.
|
ESC17-00925
| Aging Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 11:36:19 AM | | PASS |
|
|
WIP. Site is under stabalization measures. No issues.
|
ESC16-00879
| General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 11:17:10 AM | | PASS |
|
|
Not much activity on site. Talked with project manager and he will replace the witches hats.
|
ESC17-01077
| Aging Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 10:46:51 AM | | CANC |
|
|
|
ESC17-01077
| DOC - Permit Finaled | 5/31/2018 | 5/31/2018 | 5/31/2018 10:46:45 AM | P | PASS |
|
|
|
ESC17-00954
| Random Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 10:17:03 AM | P | PART |
|
|
Post Rain Inspection. No runoff from site.' Water is going around rip rap channel leading into upper western retention pond. Severe rilling coming from top north lot leading into retention pond.
|
MIS18-00205
| ESC-Conference | 5/31/2018 | 5/31/2018 | 5/31/2018 9:46:54 AM | A | PEND |
|
|
Work is on electrical box and conduit across street. Trailer and tractor stored on lot. Site has survey stakes. No site work or grading has begun. Will follow up with contractor and planning and zoning.
|