ESC19-00584
| General Inspection | 5/6/2020 | 5/6/2020 | 5/7/2020 12:04:45 PM | | PASS |
|
|
No dumped washout from town homes. Graders on site, no blowing dust. Some material for waterlined staged on site. No tracking, no issues.
|
ESC18-00818
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:15:18 PM | | PASS |
|
|
Exterior work completed, still needs landscaping.
|
ESC19-00581
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:10:48 PM | | PASS |
|
|
|
ESC18-01142
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:10:48 PM | | PASS |
|
|
No activity. Silt fence on bottom of driveway is rotted away. Sediment is starting to get high on wattles. Slope drainage covered in sand.
|
ESC18-01455
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:10:48 PM | | PASS |
|
|
RPC on site. Lot is vegetated and contained. RP is at site. No issues.
|
ESC17-00954
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:10:48 PM | | PASS |
|
|
All lots have good growth. No runoff or tracking. RP is on site daily.
|
ESC19-00574
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 1:10:48 PM | | PASS |
|
|
Still a few well pointsw pumping, water is clean, no turbiditry. Pond at willow lane park has a teal color to it. Area is excavated and temp walls installed for bracing. New crew will take over when it is time for construction. No issues at site.
|
ESC19-01584
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 11:05:46 AM | P | PASS |
|
|
One section of sidewalk has forms, not yet poured. Washout on site and in use. Road has been patched.
|
ESC19-00884
| Site Final | 5/6/2020 | 5/6/2020 | 5/6/2020 10:49:18 AM | P | PASS |
|
|
|
ESC19-00542
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 8:56:41 AM | | PASS |
|
|
Inspected 5-4 Concrete pour on upper levels of garage. Using crane and bucket to bring up mud, washout now on south side of entrance. Some more building foundations need to be poured. Lots of framng. Site is pretty clean, some mess around portable mixer.
|
ESC19-00524
| General Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 8:56:18 AM | | PASS |
|
|
Inspected 5-4. Concrete pour on upper levels of garage. Using crane and bucket to bring up mud, washout now on south side of entrance. Some more building foundations need to be poured. Lots of framng. Site is pretty clean, some mess around portable mixer.
|