Inspections for the day of: Wednesday, May 6, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00584 General Inspection5/6/20205/6/20205/7/2020 12:04:45 PM PASS
No dumped washout from town homes.
Graders on site, no blowing dust.
Some material for waterlined staged on site. No tracking, no issues.
ESC18-00818 General Inspection5/6/20205/6/20205/6/2020 1:15:18 PM PASS
Exterior work completed, still needs landscaping.
ESC19-00581 General Inspection5/6/20205/6/20205/6/2020 1:10:48 PM PASS
ESC18-01142 General Inspection5/6/20205/6/20205/6/2020 1:10:48 PM PASS
No activity.
Silt fence on bottom of driveway is rotted away. Sediment is starting to get high on wattles. Slope drainage covered in sand.
ESC18-01455 General Inspection5/6/20205/6/20205/6/2020 1:10:48 PM PASS
RPC on site. Lot is vegetated and contained. RP is at site. No issues.
ESC17-00954 General Inspection5/6/20205/6/20205/6/2020 1:10:48 PM PASS
All lots have good growth. No runoff or tracking. RP is on site daily.
ESC19-00574 General Inspection5/6/20205/6/20205/6/2020 1:10:48 PM PASS
Still a few well pointsw pumping, water is clean, no turbiditry. Pond at willow lane park has a teal color to it.
Area is excavated and temp walls installed for bracing. New crew will take over when it is time for construction. No issues at site.
ESC19-01584 General Inspection5/6/20205/6/20205/6/2020 11:05:46 AMPPASS
One section of sidewalk has forms, not yet poured. Washout on site and in use. Road has been patched.
ESC19-00884 Site Final5/6/20205/6/20205/6/2020 10:49:18 AMPPASS
ESC19-00542 General Inspection5/6/20205/6/20205/6/2020 8:56:41 AM PASS
Inspected 5-4
Concrete pour on upper levels of garage. Using crane and bucket to bring up mud, washout now on south side of entrance. Some more building foundations need to be poured. Lots of framng.
Site is pretty clean, some mess around portable mixer.
ESC19-00524 General Inspection5/6/20205/6/20205/6/2020 8:56:18 AM PASS
Inspected 5-4.
Concrete pour on upper levels of garage. Using crane and bucket to bring up mud, washout now on south side of entrance. Some more building foundations need to be poured. Lots of framng.
Site is pretty clean, some mess around portable mixer.