ESC18-00565
| BMP Violation | 5/6/2019 | 5/8/2019 | 5/14/2019 1:02:57 PM | A | CANC |
|
|
|
ESC18-00946
| General Inspection | 5/7/2019 | 5/8/2019 | 5/10/2019 12:13:55 PM | A | PASS |
|
|
No new activity, sediment starting to build up behind perimeter wattle.
|
ESC18-00904
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 3:19:19 PM | | CANC |
|
|
|
ESC18-00904
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 3:19:13 PM | P | PASS |
|
|
Wall is completed, landscape rock spread. Still some cosmetic work left.
|
ESC18-00563
| Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 3:09:25 PM | | CANC |
|
|
|
ESC18-00563
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 3:09:17 PM | P | PASS |
|
|
Home demo complete, work on new row homes.
|
ESC17-00774
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:32:13 PM | | PASS |
|
|
Irragation system now works. Creek needs trash picked up.
|
ESC17-01491
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:31:59 PM | | PASS |
|
|
Monitor until townhomes completed and area cleaned.
|
ESC18-00327
| Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:30:36 PM | | PART |
|
|
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
|
ESC18-00325
| Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:30:19 PM | | PART |
|
|
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
|
ESC18-00326
| Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:29:59 PM | | PART |
|
|
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
|
ESC18-00316
| Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:26:55 PM | | PART |
|
|
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
|
ESC17-01414
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 12:25:50 PM | | PASS |
|
|
All foundations poured, first wall has gone up. No issues.
|
ESC18-00902
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 11:58:54 AM | | CANC |
|
|
|
ESC18-00902
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 11:58:49 AM | P | PASS |
|
|
|
ESC18-00909
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 11:56:10 AM | | CANC |
|
|
|
ESC18-00909
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 11:56:04 AM | P | PASS |
|
|
|
ESC17-01009
| General Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 11:23:53 AM | | PASS |
|
|
Talked with owner while on site. All backfill is in, plan on getting framing started ASAP. Will begin landscaping along perimeter, will set up sprinklers for dust control. No ESC issues.
|
ESC19-00076
| General Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 11:03:47 AM | A | PASS |
|
|
Stabalized entances scheduled to be installed today. Buffers have been left on perimeter. Sunroc doing earthwork, bringing water trucks and sweepers everyday.
|
ESC19-00156
| BMP Violation | 5/3/2019 | 5/8/2019 | 5/8/2019 10:10:32 AM | A | DONE |
|
|
No new activity. Will monitor site and make sure all BMPs needed are in place when building begins.
|