Inspections for the day of: Wednesday, May 8, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00565 BMP Violation5/6/20195/8/20195/14/2019 1:02:57 PMACANC
ESC18-00946 General Inspection5/7/20195/8/20195/10/2019 12:13:55 PMAPASS
No new activity, sediment starting to build up behind perimeter wattle.
ESC18-00904 General Inspection5/8/20195/8/20195/8/2019 3:19:19 PM CANC
ESC18-00904 DOC - Permit Finaled5/8/20195/8/20195/8/2019 3:19:13 PMPPASS
Wall is completed, landscape rock spread. Still some cosmetic work left.
ESC18-00563 Aging Inspection5/8/20195/8/20195/8/2019 3:09:25 PM CANC
ESC18-00563 DOC - Permit Finaled5/8/20195/8/20195/8/2019 3:09:17 PMPPASS
Home demo complete, work on new row homes.
ESC17-00774 General Inspection5/8/20195/8/20195/8/2019 12:32:13 PM PASS
Irragation system now works. Creek needs trash picked up.
ESC17-01491 General Inspection5/8/20195/8/20195/8/2019 12:31:59 PM PASS
Monitor until townhomes completed and area cleaned.
ESC18-00327 Aging Inspection5/8/20195/8/20195/8/2019 12:30:36 PM PART
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
ESC18-00325 Aging Inspection5/8/20195/8/20195/8/2019 12:30:19 PM PART
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
ESC18-00326 Aging Inspection5/8/20195/8/20195/8/2019 12:29:59 PM PART
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
ESC18-00316 Aging Inspection5/8/20195/8/20195/8/2019 12:26:55 PM PART
WIP on block. Paint and/or stucco washed onto ground, mixer has no secondary containment. Some loose material at end of block.
ESC17-01414 General Inspection5/8/20195/8/20195/8/2019 12:25:50 PM PASS
All foundations poured, first wall has gone up. No issues.
ESC18-00902 General Inspection5/8/20195/8/20195/8/2019 11:58:54 AM CANC
ESC18-00902 DOC - Permit Finaled5/8/20195/8/20195/8/2019 11:58:49 AMPPASS
ESC18-00909 General Inspection5/8/20195/8/20195/8/2019 11:56:10 AM CANC
ESC18-00909 DOC - Permit Finaled5/8/20195/8/20195/8/2019 11:56:04 AMPPASS
ESC17-01009 General Inspection5/8/20195/8/20195/8/2019 11:23:53 AM PASS
Talked with owner while on site. All backfill is in, plan on getting framing started ASAP. Will begin landscaping along perimeter, will set up sprinklers for dust control. No ESC issues.
ESC19-00076 General Inspection5/7/20195/8/20195/8/2019 11:03:47 AMAPASS
Stabalized entances scheduled to be installed today. Buffers have been left on perimeter. Sunroc doing earthwork, bringing water trucks and sweepers everyday.
ESC19-00156 BMP Violation5/3/20195/8/20195/8/2019 10:10:32 AMADONE
No new activity. Will monitor site and make sure all BMPs needed are in place when building begins.