MIS18-00178
| ESC-Conference | 5/9/2018 | 5/9/2018 | 5/9/2018 3:57:17 PM | P | FAIL |
|
|
Referred to site by Mellissa. Retaining wall has been built without any permits or approvals.
|
ESC17-00791
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 2:49:09 PM | | PASS |
|
|
Site is graded and entire area has been tracked. Drainage system has been installed along entire downhill perimeter of site. No dust at time of inspection.
|
ESC17-00793
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 2:15:32 PM | | PASS |
|
|
Area is exposed but all contained to site. Pile of lumber scraps out front. Old washout area was running onto sidewalk.
|
ESC17-00693
| BMP Violation | 5/2/2018 | 5/9/2018 | 5/9/2018 12:51:54 PM | A | PASS |
|
|
Check for cleanup of washout and repair of wattle and hill. Talked to new RP, Justin no longer with company. Sidewalk has been cleaned, stucco has been raked and removed. Old washout has been consolidated in pile. Driveway is scheduled to be poured and curb cut. All will be cleaned when they complete that work.
|
ESC17-00756
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 12:33:27 PM | | PASS |
|
|
Garage is free standing and painted. Some disturbed area around, nothing leaving site.
|
ESC17-00744
| Aging Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 12:18:44 PM | | CANC |
|
|
|
ESC17-00744
| DOC - Permit Finaled | 5/9/2018 | 5/9/2018 | 5/9/2018 12:18:39 PM | P | PASS |
|
|
|
ESC17-00772
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 12:04:00 PM | | PASS |
|
|
Building is complete, rear and side have not been landscaped and are fully exposed. No dirt or dust leaving site at this time.
|
ESC17-00760
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 11:50:16 AM | | PASS |
|
|
School. Will reinspect when students not on site.
|
ESC17-00510
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 11:41:29 AM | P | FAIL |
|
|
No concrete washout, Idaho Materials is washing out onto ground. Pond completed, sifting rocks out of stockpiles, installing sidewalks and curbing.
|
ESC17-01386
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 11:11:52 AM | P | PASS |
|
|
Tilt up walls done. Site is clean, trusses and materials all stored on site. All trash is going into garbage trailer. Some spilled washout still in area of washout. Nothing is leaving site.
|
ESC16-01032
| Aging Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 10:46:27 AM | | PART |
|
|
Lots of building waste that needs to be cleaned on site. Having issues getting workers to show up and stay. Units that are completeded are clean and look good, under construction units have piles of waste waiting for pickup.
|
ESC16-01108
| General Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 10:29:51 AM | P | PASS |
|
|
Most homes complete. Concrete washout has been cleaned and removed, roll pan brought on site for final foundations. Construction site cleanup company hired to clean and remove trash. Temps also being hired for cleanup help.
|