ESC19-00141
| General Inspection | 6/17/2020 | 6/17/2020 | 6/18/2020 11:50:28 AM | | PASS |
|
|
WIP on framing and site work. Site is being keppt clean. No trackout onto Fed Way. Some mud on apron, rock entrance needs repair. New sidewalks installed, still have wattle on perimeter. No trash blown into field.
|
ESC20-00214
| BMP Violation | 6/10/2020 | 6/17/2020 | 6/17/2020 2:15:15 PM | A | PASS |
|
|
Washout made of silt fence removed. No new concrete work.
|
ESC16-00353
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 2:05:05 PM | | PASS |
|
|
No issues from rain event.
|
ESC19-01192
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 12:35:43 PM | | PASS |
|
|
Site has retained buffers, nothing leaving site. Curbing completed, road bed ready for paving. Lots of standing water in parking and staging area.
|
ESC19-01191
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 12:34:20 PM | | PASS |
|
|
Site has retained buffers, nothing leaving site. Curbing completed, road bed ready for paving. Lots of standing water in parking and staging area.
|
ESC19-00221
| Aging Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 12:25:25 PM | | PASS |
|
|
WIP on block. No dumped washout. Most exterior work completed. No issues.
|
ESC19-00371
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 12:02:01 PM | P | FAIL |
|
|
Did turbidity sample on site. Meter is calibrated, certified by manufacture, and less than 30 days old. Trent Point Inlet :146 NTU Vortex inlet : 51.4 NTU Vortex Pond Surface: 67.5 NTU Vortex Pond Outlet: 104 NTU Dame Face East Pipe:95.9 NTU Dam Face West Pipe: 82.7 NTU Creek Below Dam: 134 NTU Flow Under Dewatering Bag from Reservoir Dewatering: 489 NTU Flume where dewatering water joins creek: 262 NTU Site is out of compliance. Water turbidity was 146 NTU in, 262 NTU out. Increase of 116 NTU.
|
ESC19-00842
| Aging Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 9:50:35 AM | | CANC |
|
|
|
ESC19-00842
| DOC - Permit Finaled | 6/17/2020 | 6/17/2020 | 6/17/2020 9:50:27 AM | P | PASS |
|
|
|
ESC16-00935
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 9:40:15 AM | | PASS |
|
|
Storm drain system working, no issues.
|
ESC18-00920
| General Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 9:38:06 AM | P | PASS |
|
|
No dirt flowing off site, some cones added to try to keep people off site.
|
ESC20-00499
| Site Preparation | 6/16/2020 | 6/17/2020 | 6/17/2020 9:26:07 AM | P | PASS |
|
|
Will preserve vegetation, entrance through allley. Storm drains are a few blocks from site and won't need protection. Let them know to keep up with sweeping while excavating.
|