ESC17-00609
| Aging Inspection | 6/19/2018 | 6/19/2018 | 6/20/2018 11:30:24 AM | | PASS |
|
|
|
ESC17-00400
| General Inspection | 6/19/2018 | 6/19/2018 | 6/20/2018 11:12:50 AM | | PASS |
|
|
Addition construction looks complete. Landscapers are working on exterior west side of building. Dumpster still on site. No trackout or dust issues. No ESC issues.
|
ESC17-00623
| Site Final | 6/19/2018 | 6/19/2018 | 6/20/2018 10:09:52 AM | P | NR |
|
|
Work complete and area stable. All other trade permits still open.
|
ESC18-00349
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 2:52:09 PM | P | PASS |
|
|
Site is idle. No dirt leaving site and no dust.
|
ESC17-00596
| Aging Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 2:44:27 PM | | PASS |
|
|
No new work, no activity on the two lots.
|
ESC17-00954
| Random Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 2:20:20 PM | P | PASS |
|
|
Post Rain Inspection. Some trackout, entrance has been removed. Road bed was graded lower than incoming existing road, creating a channell onto Winsome was avoided. Neighbors driveway that flooded before was clean. Trackout will need to be addressed if rock entrance isn't rebuilt.
|
ESC18-00885
| General Inspection | 6/18/2018 | 6/19/2018 | 6/19/2018 1:05:50 PM | A | PASS |
|
|
Met with Capital Paving on site. Requested DI protection at 34th and Lassen and fabric under the entrances. A-core is on site on ACHD right of way doing sewers. No dust and some light track out.
|
ESC17-00227
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 12:32:51 PM | | PASS |
|
|
Home work complete. Grass has been planted and stabalization in progress. No ESC issues on site, everythin contained.
|
ESC16-01006
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 12:25:23 PM | | PASS |
|
|
Some rock for landscaping stored on Fenwick. Homes on Hammermill in multiple stages of completion. Portsmouth has most activity. Material is being stored in street, DI at corner of Saxton needs to be cleaned.
|
ESC17-00599
| Aging Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 11:49:34 AM | | PASS |
|
|
WIP. No new disturbances. Most of exposed area has grown back. Work looks like it has stopped.
|
ESC18-00313
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 11:43:44 AM | P | PART |
|
|
Met with Wright Bros on site. Entrance needs to be freshened up, becoming compacted and a little trackout. No washout on site yet, trucks have just washed out onto dirt. Permanent washout is scheduled to be built, street is being cleaned and swept as needed. Verbal correction request issued.
|
ESC18-00546
| Site Preparation | 6/19/2018 | 6/19/2018 | 6/19/2018 10:46:45 AM | A | PASS |
|
|
SWPPP map and book on site, permit displayed on window. Inlets in parking lot are protected. Site has entrance and private parkin lot, long way from public road.
|
ESC17-00192
| Aging Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 9:56:23 AM | | PASS |
|
|
|
ESC17-00422
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 9:42:14 AM | | PASS |
|
|
Site is clean and contained. ACHD is doing work at corner of vista and canal.
|
ESC17-00358
| General Inspection | 6/19/2018 | 6/19/2018 | 6/19/2018 8:24:16 AM | | CANC |
|
|
|