ESC19-00431
| Site Final | 6/24/2020 | 6/24/2020 | 6/30/2020 8:36:08 AM | P | PASS |
|
|
|
ESC20-00559
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 1:48:08 PM | P | PASS |
|
|
Site now landscaped. Some rilling coming off bench into lot below. RP will keep an eye out and make builder repair.
|
ESC19-00994
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 1:08:51 PM | | PASS |
|
|
East side of road is stable. West side has had lots and berms cleaned up. Some prep work for repair of sidewalk.
|
ESC19-01104
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 1:00:03 PM | | PASS |
|
|
Sidewalk has been swept, a little discolored but not bad. Site is clean.
|
ESC17-00985
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 11:36:55 AM | | PASS |
|
|
Site is all contained.
|
ESC20-00511
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 11:28:09 AM | P | PASS |
|
|
Site now has permit issued and fees paid. Will need prep inspection before work resumes.
|
ESC20-00214
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 11:27:17 AM | P | PASS |
|
|
One worker on site pulling forms. Lined washout was brought and used for pour.
|
ESC20-00335
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 11:00:56 AM | P | FAIL |
|
|
Remnants of trash fire on site, was left and some garbage on site. No entrance installed, Road and sidewalks dirty, Eyrie RP cleaned DIs and wasn't happy. Silt fence installed and still ok. Permit sign has gone missing. Message sent to owner, follow up scheduled.
|
ESC19-01656
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 10:48:11 AM | P | PASS |
|
|
No workers on site at time of inspection. Framing has begun. Building materials stored on road.
|
ESC18-01022
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 10:42:24 AM | P | PASS |
|
|
Crew on site replacing stormwater line to a bigger size. RP weill check it out and add bmps as needed. Rest of area is vegetated.
|
ESC20-00631
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 10:27:33 AM | P | PASS |
|
|
Demo work has begun, does not look like anything hauled off site. Driveway has some rilling. No permit, I installed one.
|
ESC19-00647
| General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 10:02:49 AM | P | PASS |
|
|
Exterior completed, still needs to be landscaped.
|
ESC19-00847
| Aging Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 9:17:34 AM | | PASS |
|
|
no activity
|