Inspections for the day of: Tuesday, June 30, 2020.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01066 Site Final6/26/20206/30/20207/7/2020 11:14:49 AMPPASS
ESC19-01145 Site Preparation6/25/20206/30/20206/30/2020 2:08:12 PMADEFR
BMPs should be installed, requested by contractor.
Rescheduled for 7-2. Rain pushed back start of installation.
ESC19-00093 Aging Inspection6/30/20206/30/20206/30/2020 12:34:10 PM PASS
Construction completed, still needs landscaping.
ESC19-01126 General Inspection6/30/20206/30/20206/30/2020 12:01:38 PMPPASS
Excavation for footings has begun, backfill on lot. Form trailer at site, no washout.
No workers at site.
ESC18-01411 General Inspection6/30/20206/30/20206/30/2020 12:00:57 PM PASS
Site is clean and paved. Landscape soil is stored on rear of lot.
No issues.
ESC18-01748 Aging Inspection6/30/20206/30/20206/30/2020 12:00:22 PM PASS
Home is done, no landscaping.
ESC19-00630 General Inspection6/30/20206/30/20206/30/2020 11:44:14 AM PASS
All work contained behind existing terminal.
ESC19-00608 General Inspection6/30/20206/30/20206/30/2020 11:43:42 AM PASS
Outside hangar work looks completed. Still materials and backfill laying around, no parking lot or landscaping. Area is fenced, has entrance before exiting fence and before Gowen.
No issues at site.
ESC19-00324 General Inspection6/30/20206/30/20206/30/2020 11:27:40 AMPFAIL
post rainfall inspection
Utility crew working on Warm Springs and Boven.
Boven is a muddy mess and is tracking onto Teresa.
Silt fence has been repaired and new wattle installed at La Cuesta. Largest rill was lined with poly to stop erosion. No blow outs or issues up top.
Utility crew down low is causing issues, neighbors have complained about Boven before, is a private road and they need to repair it when done.
ESC19-00584 General Inspection6/30/20206/30/20206/30/2020 11:16:21 AMPPASS
WIP on multiple phases on different units, some completed.
Site is clean, no issues.
ESC18-01636 General Inspection6/30/20206/30/20206/30/2020 11:10:29 AMPPASS
No development activity at time of inspection, site is contained, no issues.
ESC20-00271 General Inspection6/30/20206/30/20206/30/2020 11:09:56 AMPPASS
No site work.
Evans homes has started work, site is clean no issues.
ESC19-01581 General Inspection6/30/20206/30/20206/30/2020 11:09:06 AMPPASS
Crew on site setting bar and forms, no washout at site.
Water is being pumped from trench into Harris Ponds. Trench is only to keep water out of neighboring property and has no construction activity.
Talked to Jerrid Wieting foreman for forge. Talked to Rex with Knife River and was given permission to pump to holding ponds.
No issues with dewatering
ESC19-01076 General Inspection6/30/20206/30/20206/30/2020 10:50:40 AMPPASS
No new activity.
ESC19-00221 Site Final6/30/20206/30/20206/30/2020 10:40:39 AMPPASS
ESC19-00220 Site Final6/30/20206/30/20206/30/2020 10:40:26 AMPPASS
ESC19-00219 Site Final6/30/20206/30/20206/30/2020 10:40:13 AMPPASS
ESC19-01726 General Inspection6/30/20206/30/20206/30/2020 10:39:55 AMPCANC
ESC19-01726 DOC - Permit Finaled6/30/20206/30/20206/30/2020 10:39:50 AMPPASS
ESC19-00371 General Inspection6/30/20206/30/20206/30/2020 10:34:34 AMPFAIL
post rainfall inspection
Trackout at vortex from sidewalk company.
No water in vortex pond.
Some water in reservoir, no dewatering.
East pipe discharge 52.3 NTU.
Flume NTU at JH yard 62 NTU.
Pipe under Warm Springs 12.5 NTU
Only issue at site is trackout, truck and trailer still at site.
ESC19-00810 Site Final6/30/20206/30/20206/30/2020 9:20:47 AMPPASS
ESC19-00178 General Inspection6/30/20206/30/20206/30/2020 9:20:12 AM PASS
Completed and landscaped, siltfence still at bottom of hill.
ESC18-00752 General Inspection6/30/20206/30/20206/30/2020 8:38:35 AM PASS
No new activity