Inspections for the day of: Monday, July 15, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00659 General Inspection7/8/20197/15/20197/16/2019 10:28:36 AMAPASS
WIP on 3 units. Landscapers on site of northern most unit. Washout still on site. Trash contained.
Backfill removed from frontage of Fairview. Plans are to let weeds reclaim, will monitor for dust and trackout until stable.
ESC17-01632 General Inspection7/15/20197/15/20197/16/2019 9:49:57 AM PASS
WIP on steel frame. Entrance on site, no blowing dust or trackout.
ESC18-01463 Site Final7/15/20197/15/20197/15/2019 3:15:28 PMPPASS
Addressing issue fixed. Work completed and yard landscaped.
ESC18-01770 Site Preparation7/15/20197/15/20197/15/2019 2:57:56 PMPPASS
Work began without site prep. Foreman was going off of temp occupancy card and not rough in, ESC is not listed as inspection and was overlooked.
Water truck on site, no dust. Construction entrance made with round rock, contactors will sweep up trackout as needed.
Site is below grade, no perimeter control needed for current phase.
DIs around site have been protected.
Gave them permit signs to put on site.
ESC18-01771 Site Preparation7/15/20197/15/20197/15/2019 2:57:46 PMPPASS
Work began without site prep. Foreman was going off of temp occupancy card and not rough in, ESC is not listed as inspection and was overlooked.
Water truck on site, no dust. Construction entrance made with round rock, contactors will sweep up trackout as needed.
Site is below grade, no perimeter control needed for current phase.
DIs around site have been protected.
Gave them permit signs to put on site.
ESC18-01769 Site Preparation7/15/20197/15/20197/15/2019 2:57:37 PMPPASS
Work began without site prep. Foreman was going off of temp occupancy card and not rough in, ESC is not listed as inspection and was overlooked.
Water truck on site, no dust. Construction entrance made with round rock, contactors will sweep up trackout as needed.
Site is below grade, no perimeter control needed for current phase.
DIs around site have been protected.
Gave them permit signs to put on site.
ESC17-00190 General Inspection7/15/20197/15/20197/15/2019 2:31:15 PM PASS
Work on one home. No loose trash, roads and sidewalks clean.
ESC16-00353 General Inspection7/15/20197/15/20197/15/2019 2:30:12 PM PASS
No new activity, lots are stable.
ESC18-00775 General Inspection7/15/20197/15/20197/15/2019 1:00:52 PMPPASS
Met with owner on site. Foundation poured and backfill back in. Keeping site clean.
ESC17-00956 Aging Inspection7/15/20197/15/20197/15/2019 12:07:49 PM PASS
No new activity.
ESC18-00914 Site Final7/12/20197/15/20197/15/2019 11:59:01 AMPNR
Still needs stabalization.
ESC17-00768 Aging Inspection7/15/20197/15/20197/15/2019 11:39:48 AM PASS
Crew on site prepping driveway for completion.
ESC17-01088 General Inspection7/15/20197/15/20197/15/2019 10:16:50 AMPPASS
No issues at site.
ESC19-00011 General Inspection7/15/20197/15/20197/15/2019 10:15:49 AMPPASS
WIP, landscapers on site.
ESC17-00146 Aging Inspection7/15/20197/15/20197/15/2019 9:57:03 AM PASS
ESC18-01728 General Inspection7/15/20197/15/20197/15/2019 9:40:41 AMPPASS
No construction activity, site is grown. Camper now parked on site, some new piles of fill.
ESC18-01729 Site Final7/15/20197/15/20197/15/2019 9:39:37 AMPPASS
ESC18-00358 General Inspection7/15/20197/15/20197/15/2019 9:39:01 AM PASS
Site still needs landscaping. Rear is being prepped for paving, forms being placed for ped ramps.