Inspections for the day of: Thursday, July 16, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00791 General Inspection7/16/20207/16/20207/22/2020 9:41:34 AM PASS
ESC19-00371 General Inspection7/16/20207/16/20207/22/2020 9:39:22 AMPPART
Washout has been dumped at end of paving on asteroid.
L2 doing some trench work on interstellar, looks like they are installing ads perf pipe.
Vortex is paved going down hill, curb and sidewalk completed, crew on site cleaning sidewalk.
Filter fabric removed from vortex pond, more riprap has been installed and flow areas reinforced with bigger rocks.
No water on site. Message sent to RP about washout, only issue at site.
ESC19-00178 Site Final7/15/20207/16/20207/22/2020 9:21:30 AMPPASS
ESC19-01322 Aging Inspection7/16/20207/16/20207/16/2020 2:34:10 PM PART
New construction has started under demo permit.
ESC20-00609 Site Preparation7/15/20207/16/20207/16/2020 1:32:29 PMAPASS
Met with contractor on site. Good to go
ESC19-01318 Aging Inspection7/16/20207/16/20207/16/2020 12:11:41 PM CANC
ESC19-01318 DOC - Permit Finaled7/16/20207/16/20207/16/2020 12:11:34 PMPPASS
ESC19-00696 General Inspection7/16/20207/16/20207/16/2020 12:04:14 PM PASS
Site still needs landscaping.
ESC19-01145 General Inspection7/16/20207/16/20207/16/2020 12:03:51 PMPPASS
Site grading in progress. Water truck at site and being used. Still some large stockpiles. Silt fence surrounds site.
Paved road still at site.
ESC19-00702 General Inspection7/16/20207/16/20207/16/2020 11:57:03 AM PASS
East side is grown and stable.
No new activity on west side. Some areas will need reapplication of seed in fall. No building.
ESC19-01656 General Inspection7/16/20207/16/20207/16/2020 11:40:25 AMPPART
WIP on framing.
Some materials blocking sidewalk, some boot tracked dirt.
ESC19-01262 General Inspection7/16/20207/16/20207/16/2020 11:38:48 AMPPASS
WIP on framing, no issues.
ESC20-00559 DOC - Permit Finaled7/16/20207/16/20207/16/2020 11:37:42 AMPPASS
ESC19-01110 General Inspection7/16/20207/16/20207/16/2020 11:37:23 AM PASS
Home framed, site is clean.
ESC18-01022 General Inspection7/16/20207/16/20207/16/2020 11:36:26 AM PASS
Crew on site raking bank of pond getting it ready for final seeding.
Eyrie above vulture has been landscaped on south side. No grass is growing, trees have been planted.
Common area at Eyrie and wintercamp has topsoil spread.
No issues with any building lots.
ESC19-01129 General Inspection7/16/20207/16/20207/16/2020 11:05:39 AM CANC
ESC19-00304 General Inspection7/16/20207/16/20207/16/2020 11:02:42 AM PASS
North side of lake hazel has no activity, weed growth all lots stabalized.
South Side:
No trackout onto silver spur from future phase to south. Multiple SFH are completed on street.
All current lots that have activity are clean.
Neska has future phase to south, no activity but is possible for people to drive into dirt without entrance.
All empty lots along corona are vegetated with weeds.
No construction activity on maverick, all lots are stable with weeds. Washout is lined and located on maverick.
ite prep activity on southern section of site. Rock pad entrance on Merdona Wood. Currently some joint trench open on site, no heavy equipment or activity. Lots of stockpiles on site. While on site a truck hauled in more fill.
No tracking or blowing dust.
ESC20-00298 DOC - Permit Finaled7/16/20207/16/20207/16/2020 10:31:38 AMPPASS
ESC20-00325 DOC - Permit Finaled7/16/20207/16/20207/16/2020 10:31:13 AMPPASS
ESC20-00121 DOC - Permit Finaled7/16/20207/16/20207/16/2020 10:30:51 AMPPASS
ESC19-00401 General Inspection7/16/20207/16/20207/16/2020 10:04:02 AM PASS
WIP on 4 4-plexes on south of project. Everything is clean. Streets have been swept except in front of units. 2 washout pan, no dumped washout. No track out or loose trash.