ESC17-01669
| Site Final | 7/16/2019 | 7/23/2019 | 7/24/2019 10:20:57 AM | P | PASS |
|
|
|
ESC18-01312
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 2:12:42 PM | | PASS |
|
|
Site is bare but contained, below sidewalk grade out front. Rear has trash box and is clean.
|
ESC17-00315
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 12:38:02 PM | | PASS |
|
|
No new activity, weeds have been knocked down.
|
ESC16-00935
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 12:15:12 PM | | PEND |
|
|
Driveway has been cut out and being evaluated by soils engineer. Some saw cutting slurry has gone down drain and bubbled up below, some also has gone out drain into hillside. Talked with RP and will see what ACHD wants done and if they need to vac out drains. Broken concrete is currently in road.
|
ESC18-01171
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 11:57:31 AM | | PASS |
|
|
Workers installing drainage rock and tiles over rock. Old concrete washout needs to be cleaned up and removed. No major issues at site.
|
ESC18-00917
| Aging Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 11:42:35 AM | | PASS |
|
|
All work contained to backyard, front is stabalized.
|
ESC18-01300
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 11:31:12 AM | | PASS |
|
|
No visible disturbances, did not go through gate to back.
|
ESC15-00853
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 11:24:41 AM | | PASS |
|
|
WIP on one unit. Site is clean, materials being stored om bottom lots, no dirt on road
|
ESC17-01287
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 11:03:41 AM | | PASS |
|
|
Area has been cleaned up, still needs stabalization.
|
ESC17-01009
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 10:43:03 AM | | PASS |
|
|
Site is clean and contained. Fence crew on site, will need to be careful to not build in trash box.
|
ESC18-01284
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 10:25:20 AM | | PASS |
|
|
No workers on site. Uphill side my cause issues if not stabalized before rain starts.
|
ESC18-01550
| General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 10:07:49 AM | P | PASS |
|
|
Capitol paving and gas company both on site. Looks like driveway is being prepped, lot bare. Nothing leaving site.
|