Inspections for the day of: Wednesday, July 24, 2019.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01333 General Inspection7/24/20197/24/20197/24/2019 2:51:22 PM PASS
Home still needs siding finished. Lot is bare with a pile of pitrun. Perimeter gator guards have been buried, some dirt on apron that needs sweeping, one person parking on lot.
ESC18-01162 General Inspection7/24/20197/24/20197/24/2019 2:18:30 PM PASS
All work is on interior. Gator guards at perimeter, material starting to accumulate. No landscaping or stabalization has been begun.
ESC18-01346 General Inspection7/24/20197/24/20197/24/2019 2:09:57 PM CANC
ESC18-01346 DOC - Permit Finaled7/24/20197/24/20197/24/2019 2:09:50 PMPPASS
ESC19-00813 General Inspection7/10/20197/24/20197/24/2019 2:08:13 PMPPASS
Crew on site installing forms and rebar. Wattle on downhill side, backfill on uphill side of lot.
ESC19-00396 General Inspection7/17/20197/24/20197/24/2019 12:09:50 PMAPASS
Stock pile removed. Have not heard of any more issues with dust.
ESC18-00923 Aging Inspection7/24/20197/24/20197/24/2019 11:54:50 AM CANC
ESC18-00923 DOC - Permit Finaled7/24/20197/24/20197/24/2019 11:54:46 AMPPASS
expired
ESC18-00031 General Inspection7/22/20197/24/20197/24/2019 11:46:33 AMPPASS
Met with Andy the builder on site. Landscapers on site planting trees and shrubs, expect to have sod down by end of week. No esc issues.
ESC16-00556 Site Final7/24/20197/24/20197/24/2019 10:59:03 AMPPASS
Okay to final subdivision permit unless any new issues/disturbed area; we will work with CBH for any remaining issues and temp. BMP removal.
No new phasing has begun, still only work on coho and chinook.
ESC18-01438 DOC - Permit Finaled7/24/20197/24/20197/24/2019 10:42:51 AMPPASS
ESC18-01500 DOC - Permit Finaled7/24/20197/24/20197/24/2019 10:42:30 AMPPASS
ESC18-01415 DOC - Permit Finaled7/24/20197/24/20197/24/2019 10:42:23 AMPPASS
ESC18-01784 DOC - Permit Finaled7/24/20197/24/20197/24/2019 10:42:12 AMPPASS
ESC18-01787 Site Final7/24/20197/24/20197/24/2019 10:21:36 AMPPASS
ESC18-01440 Site Final7/24/20197/24/20197/24/2019 10:21:12 AMPPASS
ESC19-00304 General Inspection7/24/20197/24/20197/24/2019 9:59:51 AMPPASS
Permits for both sides of road displayed at entrance, stabalized entrance installed.
All work is currently on west side of site. Drilling rig on site not currently being used. One front end loader running on site and an excavator doing pipe work. Site has been watered and is dust free.
ESC19-00303 General Inspection7/24/20197/24/20197/24/2019 9:51:40 AMPPASS
No workers on site. Area has been graded to higher elevation than road.
ESC18-01761 General Inspection7/24/20197/24/20197/24/2019 9:45:39 AMPPASS
WIP on steel frame construction. Washout on site, was being used by pump truck at time of inspection.
No ESC issues
ESC19-00347 General Inspection7/24/20197/24/20197/24/2019 9:40:13 AMPCANC
ESC19-00347 DOC - Permit Finaled7/24/20197/24/20197/24/2019 9:40:07 AMPPASS
ESC18-01354 Site Final7/24/20197/24/20197/24/2019 9:31:18 AMPPASS
BLD finaled in end of June..
ESC18-01355 Site Final7/24/20197/24/20197/24/2019 9:31:06 AMPPASS
BLD finaled in end of June..
ESC19-00096 Site Final7/24/20197/24/20197/24/2019 9:30:44 AMPPASS