Inspections for the day of: Monday, July 27, 2020.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC20-00843 Site Preparation7/27/20207/27/20207/28/2020 12:23:05 PMPPASS
Perimeter controls installed, concrete washout on site. Rock entrance and trash box on site. Backfill is on lot above.
ESC19-00895 General Inspection7/27/20207/27/20207/28/2020 11:49:55 AM DEFR
not accesible.
ESC19-01248 General Inspection7/27/20207/27/20207/28/2020 10:29:22 AM PASS
WIP. No issues.
ESC15-00853 General Inspection7/27/20207/27/20207/28/2020 10:26:12 AM PASS
Last two units framed. Very little disturbed area remaining.
ESC19-00506 General Inspection7/27/20207/27/20207/28/2020 9:50:42 AM PASS
No work has begun on any homes, site is weed covered.
Sidewalks are all repaired and all site work looks completed.
ESC18-01769 General Inspection7/27/20207/27/20207/27/2020 11:56:28 AM PASS
Exterior building work completed.
Landscapers on site.
Contractor still parked and staged in parking lot.
Area north of job no longer used for parking, materials, or offices.
ESC19-01301 Site Final7/27/20207/27/20207/27/2020 11:42:05 AMPPASS
ESC19-00935 General Inspection7/27/20207/27/20207/27/2020 11:32:44 AMPPASS
Noo workers on site.
Sidewalks and curb work has begun. Two washouts on site, nonen dumped on ground.
Road be in place, no paving. Lots of bare area.
ESC20-00677 General Inspection7/27/20207/27/20207/27/2020 11:26:09 AMPFAIL
Dumped washout between homes.
Picture sent to RP and follow up scheduled.
Rest of area clean.
ESC20-00676 General Inspection7/27/20207/27/20207/27/2020 11:19:53 AMPFAIL
Dumped washout between homes.
Picture sent to RP and follow up scheduled.
Rest of area clean.
ESC19-01727 General Inspection7/27/20207/27/20207/27/2020 10:49:06 AMPPASS
No work on phase.
ESC18-00900 General Inspection7/27/20207/27/20207/27/2020 10:46:59 AM PASS
Southern half is bare and has stockpiles.
Northern half has paved roads, curbing, and sidewalk.
ne crew working on nw corner, have water truck, no issues.
ESC19-01619 General Inspection7/27/20207/27/20207/27/2020 10:24:44 AMPPASS
All site work looks completed. Still some stockpiles on paved lot. All roads and sidewalks rebuilt. Truck on site to haul away job trailer.
Suez crew on site flushing hydrants onto roads, no picked up sediment. Fence contractor hauling off chain link perimeter fence.
Area still needs to be landcaped.
ESC19-01200 General Inspection7/27/20207/27/20207/27/2020 10:20:12 AM DONE
ESC19-00453 Site Final7/24/20207/27/20207/27/2020 9:53:19 AMPPASS
ESC18-00172 Aging Inspection7/27/20207/27/20207/27/2020 9:52:54 AM PASS
Not landscaped. Starting to become weed stabalized.
ESC18-01431 Aging Inspection7/27/20207/27/20207/27/2020 9:42:20 AM PASS
Exterior looks completed. Entire site is pitrun and contained.
ESC18-00176 Aging Inspection7/27/20207/27/20207/27/2020 9:30:08 AM PASS
Building completed, parking lot done, landscaping has begun.
ESC19-00509 General Inspection7/27/20207/27/20207/27/2020 9:18:25 AM PASS
WIP on framing, site is clean.