ESC18-00548
| General Inspection | 7/27/2018 | 7/30/2018 | 7/30/2018 2:57:25 PM | A | PASS |
|
|
Site prep work complete. Road, curb, gutters, and sidewalk all installed. New drain inlets have witches hats. No dirt leaving site.
|
ESC17-00382
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 2:40:47 PM | | PASS |
|
|
Lot is stripped and ready for landscaping. Forms are being placed in rear for parking lot.
|
ESC16-00935
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 2:25:13 PM | | PART |
|
|
Load of pitrun has been dumped halfway on road, on top of protected storm drain. Sand bag around lower drain is starting to fail and lose sand, inlet has witches hat. Hillside is stable.
|
ESC16-00936
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 2:23:52 PM | | PASS |
|
|
Hillsides are stable, some rock work below house. Little bit of trackout from workers in driveway
|
ESC15-00094
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 12:57:54 PM | | PASS |
|
|
Neighborhood is clean. Homes under construction all have their own BMPs. There are no neighborhood specific BMPs.
|
ESC17-00791
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 12:45:48 PM | | PASS |
|
|
No new activity since stabalization.
|
ESC18-00558
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 12:36:30 PM | P | PASS |
|
|
Two homes being built next to eachother. Each lot has construction entrance, workers are parked on street. Water truck on site. Piece of gator guard not trenched in protectiong drainage on sout side. Large dirt stockpile close to drainage, only a small natural buffer. Sites are clean and free from trash. No fugitive dust.
|
ESC18-00392
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 12:36:12 PM | P | PASS |
|
|
Two homes being built next to eachother. Each lot has construction entrance, workers are parked on street. Water truck on site. Piece of gator guard not trenched in protectiong drainage on sout side. Large dirt stockpile close to drainage, only a small natural buffer. Sites are clean and free from trash. No fugitive dust.
|
ESC13-01279
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 12:23:41 PM | | PART |
|
|
Silt fence on north side has fallen and can be removed, no longer serving any purpose. Trusses are being stored on sidewalk. Lots of stucco waste on homesites.
|
ESC17-01463
| Site Final | 7/30/2018 | 7/30/2018 | 7/30/2018 11:51:13 AM | P | PASS |
|
|
|
ESC17-01457
| Site Final | 7/30/2018 | 7/30/2018 | 7/30/2018 11:50:58 AM | P | PASS |
|
|
|
ESC16-01586
| Aging Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 11:24:36 AM | | PASS |
|
|
All disturbances contained to back yard.
|
ESC17-00439
| Aging Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 11:15:55 AM | | PASS |
|
|
Work looks completed. Lot is landscaped.
|
ESC14-00484
| Aging Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 11:07:53 AM | | PASS |
|
|
Scaffolding surrounds home. Yard is growing and stable. Old lumber pile in backyard.
|
ESC18-00891
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 10:56:54 AM | P | PASS |
|
|
Work on framing. All backfill is being stored on the neighboring vacant parcels.
|
ESC17-01522
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 10:46:57 AM | P | PASS |
|
|
Home is framed. Lot is still exposed, no esc issues. Material storage is all contained to site.
|
ESC17-01521
| Site Final | 7/30/2018 | 7/30/2018 | 7/30/2018 10:46:03 AM | P | PASS |
|
|
|
ESC18-00349
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 10:32:26 AM | P | PASS |
|
|
Curb in place along Breneman, sidewalk is prepped but not poured. A few feet of Breneman is torn up along lenght of curb. Site is still inactive and exposed. Some stockpiles on site, no dust at time of inspection. Some dirt on sidewalk.
|
ESC16-01235
| Aging Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 10:00:10 AM | | CANC |
|
|
|
ESC16-01235
| DOC - Permit Finaled | 7/30/2018 | 7/30/2018 | 7/30/2018 9:59:48 AM | P | PASS |
|
|
|
ESC18-00014
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 9:58:46 AM | P | PASS |
|
|
Building shell is up, masons cutting and fitting bricks along lower section, some dust from saw. Water truck arrived while I was on site. Most areas below grade of road, spot where it is not are protected by wattles. Forms are in place for curbing, crews working on prep for pour. Eco pan on site.
|
ESC17-01479
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 9:31:24 AM | P | PASS |
|
|
Some utility work at front of site. No new activity n site. No equipment or materials on site. No fugitive dust or material leaving site.
|
ESC17-00426
| General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 9:18:41 AM | | PASS |
|
|
Homes in all states of construction. Some trusses are being stored in road. Stucco is causing biggest mess. Lots of homes are now occupied forcing site to remain clean.
|