ESC19-01358
| General Inspection | 7/30/2020 | 7/30/2020 | 8/6/2020 8:02:16 AM | | CANC |
|
|
|
ESC20-00652
| Site Final | 7/30/2020 | 7/30/2020 | 8/3/2020 10:14:15 AM | P | NR |
|
|
Message sent to RP. Site still needs inlet protection removed.
|
ESC20-00496
| General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 11:13:54 AM | P | PASS |
|
|
Permits now issued, work began without permits. Backfill starting to be replaced along basement walls, water on site. Sidewalk and street swept and clean.
|
ESC20-00676
| BMP Violation | 7/27/2020 | 7/30/2020 | 7/30/2020 10:06:36 AM | A | FAIL |
|
|
All trades hold issued. No corrections made and washout not cleaned.
|
ESC18-00023
| General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 9:58:47 AM | | PASS |
|
|
Area is stable, silt fence still along southern perimeter.
|
ESC19-00082
| General Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 9:17:41 AM | | PASS |
|
|
Talked with owner while at site. Plans on getting topsoil and hill above house finished up. Will have bmps repaired. Site is clean. Hillside vegetation starting to regrow on lot.
|
ESC19-00542
| Tracking Control | 7/27/2020 | 7/30/2020 | 7/30/2020 9:03:54 AM | A | PASS |
|
|
Suez work in road done, has been patched and cleaned.
|