Inspections for the day of: Tuesday, July 7, 2020.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01145 General Inspection7/2/20207/7/20207/9/2020 10:39:58 AMPPASS
Driveway was patched and now paved all the way down, paved up top for truck turn around.. Site is being watered, no dust clouds. Some large stockpiling on site. Perimeter BMPs ok, no current issues.
ESC17-00954 General Inspection7/7/20207/7/20207/9/2020 9:58:45 AM PASS
All ots clean and stable, lots of vegetation. No issues at site.
ESC18-01455 General Inspection7/7/20207/7/20207/9/2020 9:58:13 AM PASS
Site is clean and contained. Entrance in good shape, no tracking.
ESC19-00983 DOC - Permit Finaled7/7/20207/7/20207/7/2020 1:04:05 PMPPASS
ESC19-01143 DOC - Permit Finaled7/7/20207/7/20207/7/2020 1:03:57 PMPPASS
ESC19-01044 DOC - Permit Finaled7/7/20207/7/20207/7/2020 1:03:01 PMPPASS
ESC19-00717 DOC - Permit Finaled7/7/20207/7/20207/7/2020 1:02:53 PMPPASS
ESC18-01586 Aging Inspection7/7/20207/7/20207/7/2020 12:55:40 PM PASS
No new activity, home still on blocks.
ESC18-01633 Aging Inspection7/7/20207/7/20207/7/2020 11:36:16 AM CANC
ESC18-01633 DOC - Permit Finaled7/7/20207/7/20207/7/2020 11:36:10 AMPPASS
ESC19-01617 DOC - Permit Finaled7/7/20207/7/20207/7/2020 10:59:05 AMPPASS
ESC19-01425 DOC - Permit Finaled7/7/20207/7/20207/7/2020 10:58:56 AMPPASS
ESC19-01597 DOC - Permit Finaled7/7/20207/7/20207/7/2020 10:58:41 AMPPASS
ESC18-00426 DOC - Permit Finaled7/7/20207/7/20207/7/2020 10:58:14 AMPPASS
ESC19-00181 General Inspection7/7/20207/7/20207/7/2020 10:50:02 AMPPASS
WIP on multiple buildings. Teneants are expected to move into a few buildings end of the month.
Site is clean, areas are being watered to keep dust down, sweeper comes twice a week.
ESC19-00160 General Inspection7/7/20207/7/20207/7/2020 10:16:52 AMPPASS
WIP on vertical and framing on three units, all foundations completed. Site has multiple trash and wood boxes. Trash crew scheduled for pickup. Road and sidewalks being swept.
ESC20-00144 General Inspection7/7/20207/7/20207/7/2020 10:00:43 AMPPASS
WIP on building exterior. Parking lot and drive through paved and curbing completed, washout pan at site. Large dumpster, no loose trash.
No issues at site.
ESC19-00872 Site Final7/7/20207/7/20207/7/2020 9:51:18 AMPPASS
ESC19-01564 Site Preparation7/7/20207/7/20207/7/2020 9:50:54 AMPDEFR
No activity at site. There is paved parking lot that is completed but no work on any building or any survey markers.
ESC18-01677 Aging Inspection7/7/20207/7/20207/7/2020 9:35:27 AM CANC
ESC18-01677 DOC - Permit Finaled7/7/20207/7/20207/7/2020 9:35:15 AMPPASS
ESC20-00556 Site Preparation7/6/20207/7/20207/7/2020 9:22:19 AMPPASS
Gator guard installed, is getting more statkes. Water available on site, bringing leak proof washout contained.
Left permit sign inside excavator.
ESC19-00713 Aging Inspection7/7/20207/7/20207/7/2020 9:07:32 AM PASS
Work area clean and contained. Building exteriors about completed. Still needs landscaping. No issues.
ESC19-00712 Aging Inspection7/7/20207/7/20207/7/2020 9:07:15 AM PASS
Work area clean and contained. Building exteriors about completed. Still needs landscaping. No issues.