Inspections for the day of: Thursday, August 16, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00203 Site Final8/13/20188/16/20188/17/2018 12:23:11 PMAPASS
Spoke with foreman. He will remove 2 witches hats fro Elite located by school bus yard.
ESC17-01125 General Inspection8/16/20188/16/20188/16/2018 2:42:34 PM PASS
Site is prepped for sprinkler system and top soil. Currently there are no BMPs on site.
ESC14-01063 General Inspection8/16/20188/16/20188/16/2018 1:03:07 PM PASS
All homes in phase completed. Old washout can be removed, community areas completed with landscaping, and general walk through and trash picked up. Permit can be closed once all completed.
Inlet protection should stay in due to new phase and construction uphill.
ESC15-00857 General Inspection8/16/20188/16/20188/16/2018 12:51:24 PM PASS
Upper phase is clean. Some trailers and machines are on road in preparation of next phase. No new home construction has begun.
ESC17-00837 General Inspection8/16/20188/16/20188/16/2018 12:41:18 PM PASS
Exterior work and landscaping complete. Some small rills starting from irragation water running into lot below. Would install wattle along both lot lines to prevent dirt coming from vacant lot above and water eroding onto vacant lot below.
ESC17-01387 General Inspection8/16/20188/16/20188/16/2018 12:12:25 PM PASS
No disturbance, no ESC issues.
ESC17-01287 General Inspection8/16/20188/16/20188/16/2018 12:03:57 PM PASS
All BMPs still in place. Sandbags across street are starting to tear.
ESC18-00210 Tracking Control8/15/20188/16/20188/16/2018 11:34:48 AMACANC
Check for alley cleanup
Not as bad as 8-15, still some dirt in alley.
ESC18-00209 Tracking Control8/15/20188/16/20188/16/2018 11:34:33 AMAPASS
Check for alley cleanup
Not as bad as 8-15, still some dirt in alley.
ESC18-00208 Tracking Control8/15/20188/16/20188/16/2018 11:34:09 AMAPASS
Check for alley cleanup.
Not as bad as 8-15, still some dirt in alley.
ESC17-00935 Aging Inspection8/16/20188/16/20188/16/2018 11:25:55 AM PASS
ESC17-00935 DOC - Permit Finaled8/16/20188/16/20188/16/2018 11:25:41 AMPPASS
ESC17-01389 General Inspection8/16/20188/16/20188/16/2018 11:18:30 AM PASS
Working on framing. Site is below grade of alley. Concrete washouts have been cleaned, will need a rebuild before next pour.
ESC17-00963 Aging Inspection8/16/20188/16/20188/16/2018 9:38:27 AM CANC
ESC17-00963 DOC - Permit Finaled8/16/20188/16/20188/16/2018 9:38:19 AMPPASS
ESC17-01206 Aging Inspection8/16/20188/16/20188/16/2018 8:58:52 AM CANC
ESC17-01206 DOC - Permit Finaled8/16/20188/16/20188/16/2018 8:58:46 AMPPASS
ESC17-01158 General Inspection8/15/20188/16/20188/15/2018 9:42:11 AMAPASS
ESC18-00497 General Inspection8/15/20188/16/20188/15/2018 9:41:24 AMAPASS
Creeks and ditch clean. BMPs are along road where dust control runoff may enter watereays. Creek culvert is completed. Still minor dewatering. Pumps are in place to soon bypass section of sewer.