ESC18-00956
| General Inspection | 8/21/2019 | 8/21/2019 | 8/26/2019 12:19:39 PM | | PEND |
|
|
Currently grading site. Lots of dirt on sidewalk. Follow up scheduled for 8/29
|
ESC18-01411
| General Inspection | 8/21/2019 | 8/21/2019 | 8/22/2019 10:08:41 AM | | PASS |
|
|
WIP on putting backfill back within foundation. Multiple large stockpiles on site, no blowing dust. Rock entrance can use some freshening up, no trackout at time of inspection.
|
ESC19-00994
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 2:43:27 PM | P | PASS |
|
|
Majority of work is on east side of Bogus Basin Rd. Water trucks running, crew running compactor along side of road. Hillside grubbing has begun. No tracking or wattles installed on steep slopes. Lots of cutting on sout west of project also. No dusst, watter trucks getting water at hydrant in church parking lot at Cartwright.
|
ESC18-01163
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 2:01:45 PM | | PASS |
|
|
Washout has been cleaned.
|
ESC18-01162
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 2:00:26 PM | | PASS |
|
|
Crew on site installing retaining wall and ADS drainage. Some topsoil is stored on street.
|
ESC19-00601
| General Inspection | 8/15/2019 | 8/21/2019 | 8/21/2019 1:51:18 PM | P | FAIL |
|
|
Construction entrance not installed as requested. Apron mostly swept, some dirt on one side. Large pile of trash in front of garage door, risk of plastic and boxes blowing away, trash box also on site.
|
ESC17-00985
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 12:27:59 PM | | PASS |
|
|
Hillside has been hydroseeded. Good growth in shaded areas that get water from sprinklers. Top of lot still disturbed, nothing leaving site.
|
ESC19-00544
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 12:21:08 PM | P | PASS |
|
|
Exterior is now getting stucco, mixer in driveway. Some trash around site.
|
ESC19-00994
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 12:20:54 PM | P | PASS |
|
|
entry error
|
ESC18-01022
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 12:06:56 PM | | PASS |
|
|
No workers on site, all equipment except one dump truck gone. Still some water pipe and precast vaults at site. Rock entrance installed, no blowing dust.
|
ESC18-00928
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 11:49:47 AM | | PASS |
|
|
Silt fence and weed perimeter. Concrete steps in front completed.Lots of broken concrete piled in driveway. Crew on site sweeping sidewalk and cleaning gutter.
|
ESC19-00396
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 11:32:22 AM | P | PART |
|
|
Met with Devin who is lead on framing. He sprays the site down at lunch and end of day, will knock the top of pile and spray that as well. Silt fence still hasn't been trenched in.
|
ESC18-01447
| Tracking Control | 8/21/2019 | 8/21/2019 | 8/21/2019 11:17:01 AM | P | DEFR |
|
|
New contractor, listed RP no longer working for owner, will need to update permit.
|
ESC19-00519
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 10:44:12 AM | P | PASS |
|
|
No sign of work from front.
|
ESC17-01710
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 10:38:54 AM | P | PASS |
|
|
Met with builder at site. Area is clean, no ESC issues.
|
ESC19-00506
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 10:01:52 AM | P | PASS |
|
|
Sewer is getting inspection, if passed tere will be no more dewatering. Currently no trenches or pumps, no construction activity until results of sewer are in. No trackout or dust.
|
ESC18-00774
| DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 9:41:51 AM | P | PASS |
|
|
|
ESC18-00947
| Aging Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 9:23:42 AM | | PASS |
|
|
All work looks completed and area stable.
|
ESC17-01132
| General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 9:15:23 AM | P | PASS |
|
|
All disturbance is around 29th and Idaho area. Jeffereson side is completed and stabalized. Disturbed areas have topsoil but not yet landscaped.
|
ESC19-00145
| BMP Violation | 8/14/2019 | 8/21/2019 | 8/20/2019 12:16:07 PM | A | PART |
|
|
Construction entrance extended and workers now parking closer to railroad tracks where it is rock, Washout is now lined. One front end loader running around kicking up lots of dust, some dust trackout, stained but no chunks of dirt.
|