Inspections for the day of: Wednesday, August 22, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01395 General Inspection8/22/20188/22/20188/22/2018 2:41:01 PM CANC
ESC17-01323 Aging Inspection8/22/20188/22/20188/22/2018 2:40:53 PM PASS
No disturbances.
ESC18-00498 General Inspection8/22/20188/22/20188/22/2018 2:31:21 PMPPASS
Area of hillside grading completed. Wattles have been installed on tracked slopes, areas have been hydroseeded. Work still in progress prepping future lot locations. Water truck on site.
ESC17-00455 General Inspection8/22/20188/22/20188/22/2018 2:19:08 PM DEFR
Gate was locked.
ESC17-00190 General Inspection8/22/20188/22/20188/22/2018 12:43:16 PM PASS
No work on homes has begun. Storm drains still have a bit of dirt in them.
ESC17-00446 General Inspection8/22/20188/22/20188/22/2018 11:57:27 AM CANC
ESC17-00446 DOC - Permit Finaled8/22/20188/22/20188/22/2018 11:57:18 AMPPASS
No site activity for 90 days.
ESC17-01002 General Inspection8/10/20188/22/20188/22/2018 11:39:12 AMAPASS
Driveways are prepped for concrete. Majority of site is belo grade of road. Lot is exposed, nothing leaving site. Mason on site cutting bricks, causing lots of dust.
ESC17-01431 General Inspection8/22/20188/22/20188/22/2018 10:59:38 AM CANC
ESC17-01431 DOC - Permit Finaled8/22/20188/22/20188/22/2018 10:59:32 AMPPASS
ESC17-01051 Aging Inspection8/22/20188/22/20188/22/2018 10:49:02 AM PASS
Silt fence along sidewalk needs to be repaired or removed. Site is being prepped for concrete, will need washout before pour. No current ESC issues.
ESC17-01437 General Inspection8/22/20188/22/20188/22/2018 10:27:13 AM PASS
Home is complete, landscapers on site.
ESC17-01200 General Inspection8/22/20188/22/20188/22/2018 10:07:07 AM PASS
All lots paved, curb, gutters, and sidewalks completed. Currently spreading topsoil back over site. Expected to hydroseed are in next few weeks.