Inspections for the day of: Tuesday, August 6, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01472 Aging Inspection8/6/20198/6/20198/8/2019 2:31:39 PM PASS
Work completed and area stabalized.
ESC19-00260 General Inspection7/16/20198/6/20198/8/2019 10:37:26 AMPFAIL
Met with Ken the foreman on site.
Foundation workers overflowed washout and did some washing oit onto lot. He is cleaning it up and having main washout picked up.
ESC18-00956 General Inspection8/6/20198/6/20198/8/2019 9:59:16 AM PASS
Exterior work is completed. Site still needs to be landscaped. No dirt leaving site, no loose trash.
ESC17-00985 General Inspection8/6/20198/6/20198/7/2019 2:19:52 PM PASS
Hillside vegetation starting to regrow.
ESC18-01022 General Inspection8/6/20198/6/20198/7/2019 12:13:34 PM PASS
Small crew at top of site. Lower section is not active. Damaged areas from draining pool have been fixed. No trackout or dust, few stockpiles on site. Hillside vegetation doing good, few spots will need repairs.
ESC18-00928 General Inspection8/6/20198/6/20198/7/2019 12:13:34 PM PASS
Most of front silt fence removed to make room for work on front steps. Sidewalk looks swept. Most remaining bark wattle has been destroyed.
ESC17-01690 Aging Inspection8/6/20198/6/20198/7/2019 10:18:09 AM PASS
Exterior work completed. Landscaper on site.
ESC17-01685 Aging Inspection8/6/20198/6/20198/7/2019 10:17:54 AM PASS
Exterior work completed. Landscaper on site.
ESC19-00356 General Inspection8/6/20198/6/20198/6/2019 11:36:33 AMPPASS
Prep work for parcels is completed. No new activity. Lots are starting to overgrow and be stabalized.
ESC19-00943 General Inspection8/6/20198/6/20198/6/2019 11:14:06 AMPPEND
Foundation has been poured, no washout on site.
Washout pile dumped in lot next door, pictures sent to RP to see if it is theirs.
ESC19-00718 General Inspection8/6/20198/6/20198/6/2019 11:08:31 AMPPASS
No disturbances coming from backyard. Fence has been reinstalled.
ESC19-00760 General Inspection8/6/20198/6/20198/6/2019 10:57:16 AMPPASS
Foundation poured, washout on site and used. Building materials on site, no workers.
ESC18-00168 DOC - Permit Finaled8/6/20198/6/20198/6/2019 10:40:58 AMPPASS
ESC18-01464 DOC - Permit Finaled8/6/20198/6/20198/6/2019 10:39:44 AMPPASS
ESC18-01208 General Inspection8/6/20198/6/20198/6/2019 10:35:20 AMPPASS
Home completed, still needs landscaping.
ESC19-00756 General Inspection8/6/20198/6/20198/6/2019 10:33:58 AMPPASS
Foundation poured, washout on site and used, is about full. Pool guys on site, home will have an attached indoor pool.
Sidewalk needs to swept at end of day.
ESC18-00006 Site Final7/29/20198/6/20198/6/2019 10:10:38 AMAPASS
// Kevin Phone #: ###-####
Close permit if micron gives ok
ESC18-00006 DOC - Permit Finaled8/6/20198/6/20198/6/2019 10:10:25 AMPPASS
ESC18-01635 General Inspection8/2/20198/6/20198/5/2019 11:33:55 AMPPASS
Lot excavated for basemnt. All fill is stored on lot, water is available. No issues at time of inspection.