Inspections for the day of: Thursday, August 6, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00839 General Inspection8/6/20208/6/20208/7/2020 10:53:07 AM PASS
Site is being watered for dust control multiple times a week. No blowing dust at time of inspection. Southern area is further along, more units getting close to being finished and turned over. Plan to be paved before winter.
No issues at time of inspection
ESC18-01142 General Inspection8/6/20208/6/20208/6/2020 11:59:06 AM DONE
No changes.
ESC18-01455 General Inspection8/6/20208/6/20208/6/2020 11:58:49 AM PASS
Site is contained. Some dust on driveway when worker left.
ESC17-00954 General Inspection8/6/20208/6/20208/6/2020 11:57:53 AM PASS
No issues with sub.
ESC19-00396 General Inspection8/6/20208/6/20208/6/2020 11:45:33 AM PASS
Landscapers on site.
ESC18-01447 General Inspection8/6/20208/6/20208/6/2020 11:44:25 AM PASS
Home is framed, starting to be prepped for stucco. Some material still being stored in lot. Large dumpster on site, no issues.
ESC19-00771 DOC - Permit Finaled8/6/20208/6/20208/6/2020 10:35:35 AMPPASS
ESC19-01404 General Inspection8/6/20208/6/20208/6/2020 10:20:05 AM PASS
WIP on interiors.
ESC19-01251 General Inspection8/6/20208/6/20208/6/2020 10:19:49 AM PASS
WIP on interiors.
ESC19-01250 General Inspection8/6/20208/6/20208/6/2020 10:19:34 AM PASS
WIP on interiors.
ESC20-00914 Site Preparation8/5/20208/6/20208/6/2020 9:50:11 AMAPASS
Pad is contained in lot, will need washout.
ESC19-00931 Aging Inspection8/6/20208/6/20208/6/2020 9:25:31 AM PASS
Home is completed. Lot is still bare, mini excavator parked on site. Driveway is gravel.
ESC20-00610 Site Preparation8/5/20208/6/20208/6/2020 9:18:35 AMAPASS
L3 will be excavator. Site needs to be stripped to be recompacted. Water will be pulled from suez site on Hill road. Not sure on amount of material hauled off or in until they see how it will compact.
Lance Butler with Syman will be esc contact. Dust control will be primary issue for first few weeks.
BMPs will be installed as needed, will use berms to isolate lots and hillsides. Plan on seeding in october.
Work will probably begin week of 8-24 and grading scheduled for 10 working days.
Existing cattle guard will work as track pad. Recomend pit run road for time being, switching to track pad for fall once grading completed. L3 will get sweeper on schedule for trackout, some expected from water truck, will water site before grubbing.
Follow up scheduled for 8-26
ESC20-00631 Site Final8/5/20208/6/20208/6/2020 8:00:44 AMAPASS
project now covered by ESC20-00610