ESC19-00839
| General Inspection | 8/6/2020 | 8/6/2020 | 8/7/2020 10:53:07 AM | | PASS |
|
|
Site is being watered for dust control multiple times a week. No blowing dust at time of inspection. Southern area is further along, more units getting close to being finished and turned over. Plan to be paved before winter. No issues at time of inspection
|
ESC18-01142
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 11:59:06 AM | | DONE |
|
|
No changes.
|
ESC18-01455
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 11:58:49 AM | | PASS |
|
|
Site is contained. Some dust on driveway when worker left.
|
ESC17-00954
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 11:57:53 AM | | PASS |
|
|
No issues with sub.
|
ESC19-00396
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 11:45:33 AM | | PASS |
|
|
Landscapers on site.
|
ESC18-01447
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 11:44:25 AM | | PASS |
|
|
Home is framed, starting to be prepped for stucco. Some material still being stored in lot. Large dumpster on site, no issues.
|
ESC19-00771
| DOC - Permit Finaled | 8/6/2020 | 8/6/2020 | 8/6/2020 10:35:35 AM | P | PASS |
|
|
|
ESC19-01404
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 10:20:05 AM | | PASS |
|
|
WIP on interiors.
|
ESC19-01251
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 10:19:49 AM | | PASS |
|
|
WIP on interiors.
|
ESC19-01250
| General Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 10:19:34 AM | | PASS |
|
|
WIP on interiors.
|
ESC20-00914
| Site Preparation | 8/5/2020 | 8/6/2020 | 8/6/2020 9:50:11 AM | A | PASS |
|
|
Pad is contained in lot, will need washout.
|
ESC19-00931
| Aging Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 9:25:31 AM | | PASS |
|
|
Home is completed. Lot is still bare, mini excavator parked on site. Driveway is gravel.
|
ESC20-00610
| Site Preparation | 8/5/2020 | 8/6/2020 | 8/6/2020 9:18:35 AM | A | PASS |
|
|
L3 will be excavator. Site needs to be stripped to be recompacted. Water will be pulled from suez site on Hill road. Not sure on amount of material hauled off or in until they see how it will compact. Lance Butler with Syman will be esc contact. Dust control will be primary issue for first few weeks. BMPs will be installed as needed, will use berms to isolate lots and hillsides. Plan on seeding in october. Work will probably begin week of 8-24 and grading scheduled for 10 working days. Existing cattle guard will work as track pad. Recomend pit run road for time being, switching to track pad for fall once grading completed. L3 will get sweeper on schedule for trackout, some expected from water truck, will water site before grubbing. Follow up scheduled for 8-26
|
ESC20-00631
| Site Final | 8/5/2020 | 8/6/2020 | 8/6/2020 8:00:44 AM | A | PASS |
|
|
project now covered by ESC20-00610
|