ESC19-00779
| General Inspection | 9/19/2019 | 9/19/2019 | 9/23/2019 2:56:51 PM | P | PASS |
|
|
Met with foreman on site. Crews are laying forms and bar for footings, building will take entire lot. When they pour eco pans on site and will run sweeper behind trucks, will be using alley. Springtime they are expecting to install silva cells and have more disturbances. No dirt leaving site, no dust or any other issues.
|
ESC18-00497
| General Inspection | 9/19/2019 | 9/19/2019 | 9/20/2019 8:28:58 AM | | CANC |
|
|
|
ESC18-01124
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 2:27:09 PM | | PASS |
|
|
Site is contained and OK. No major issues.
|
ESC19-00927
| General Inspection | 9/18/2019 | 9/19/2019 | 9/19/2019 12:29:26 PM | P | PASS |
|
|
Pipe crew is off site. Still some trenches and stockpiles on lot. Wattle runs along perimeter of road. Stockpiles and site disturbances have natural buffer.
|
ESC18-00844
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 12:18:27 PM | | PASS |
|
|
Site is clean and contained, still not stabilized.
|
ESC19-00696
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 12:18:00 PM | P | PASS |
|
|
Framing has begun. Site is clean, looks like washout was hauled off. Will need trash container for wood scraps.
|
ESC19-00968
| Site Final | 9/19/2019 | 9/19/2019 | 9/19/2019 11:56:28 AM | P | PASS |
|
|
|
ESC18-01128
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 11:39:40 AM | | PASS |
|
|
2 western buildings completed, parking lot pavead and landscaped. East side is all fenced and has no activity.
|
ESC19-00428
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 11:23:28 AM | P | FAIL |
|
|
Lots of trackout onto bird, entrance is compacted. Poor aim at washout. No one in job trailer. Message sent to listed RP
|
ESC18-00023
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 11:03:09 AM | P | PASS |
|
|
Lot is grown and stabilized.No esc issues.
|
ESC18-01667
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 10:18:04 AM | P | PASS |
|
|
Multiple stages of work from steel framing to setting forms. Area has been filled an elevation icreased. Steep slope leading to silt fence around canal, berm left at bottom on west side near storage lot next door. kers parked on pavement. No loose trash or trackout, no issues.
|
ESC19-00351
| General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 9:57:45 AM | P | PASS |
|
|
SXite prep work completed. No building have begun.
|
ESC18-01361
| Aging Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 9:30:35 AM | | CANC |
|
|
|
ESC18-01361
| DOC - Permit Finaled | 9/19/2019 | 9/19/2019 | 9/19/2019 9:30:29 AM | P | PASS |
|
|
|