ESC17-01195
| Aging Inspection | 9/21/2018 | 9/21/2018 | 9/24/2018 11:27:18 AM | | CANC |
|
|
|
ESC17-01281
| Site Final | 9/21/2018 | 9/21/2018 | 9/24/2018 9:45:00 AM | P | PASS |
|
|
|
ESC18-01121
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 3:06:28 PM | P | PASS |
|
|
Wellpoint is in place. Dewatering is currently shut down until next week. No turbidity has made it past curtain. Allowing water to settle.
|
ESC13-01279
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 2:27:00 PM | P | PEND |
|
|
Site contained. Left message with Kyle to remove or repair silt fence.
|
ESC17-01122
| Aging Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 2:24:25 PM | | CANC |
|
|
|
ESC17-01122
| DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 2:24:18 PM | P | PASS |
|
|
|
ESC17-01469
| Aging Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 2:23:37 PM | | PASS |
|
|
Site is clean, no ESC issues.
|
ESC18-00983
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 12:45:23 PM | P | PASS |
|
|
No dust or trackout. No hillside bmps or tracking. Will need to meet with RP after L3 is finished to see what the plan is for stabalization.
|
ESC18-01071
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 12:14:27 PM | P | PASS |
|
|
no new activity.
|
ESC17-01360
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 11:53:49 AM | P | PART |
|
|
Multiple homes under construction. Community BMPs installed, two washouts on site. Some wind blown trash around site. Some trackout and dirt accumulation in gutters.
|
ESC16-01650
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 11:28:59 AM | | PEND |
|
|
None of previous request were addressed. Workers are parking on shoulder of Warm Springs, some irragation water and mud in ditch.
|
ESC17-00774
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 11:03:08 AM | | PASS |
|
|
Relocation is completed, vegetation has grown in. Some wind blown trash in channel, need to see who is responsible for up keep. Permit will remain open.
|
ESC17-01276
| Aging Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 10:48:06 AM | | CANC |
|
|
|
ESC17-01276
| DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 10:47:53 AM | P | PASS |
|
|
|
ESC18-00260
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 10:07:43 AM | P | PASS |
|
|
No site prep work. Only work is signs of test pits for drainage calculations.
|
ESC18-00558
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 9:52:14 AM | P | PASS |
|
|
Two homes being done under same inspection. All foundation work complete, concrete washout on site and clean. Homes are being framed, sites are clean. Excavator on site, loading into dump truck, some dirt on sidewalk. Rock channels along perimeter need better protection.
|
ESC18-00392
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 9:51:58 AM | P | PASS |
|
|
Two homes being done under same inspection. All foundation work complete, concrete washout on site and clean. Homes are being framed, sites are clean. Excavator on site, loading into dump truck, some dirt on sidewalk. Rock channels along perimeter need better protection.
|
ESC17-00078
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 9:33:43 AM | | PASS |
|
|
Foundation for first home is completed. Neighborhood is clean, nothing leaving site.
|
ESC18-01265
| General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 9:28:34 AM | P | DONE |
|
|
Did walkthrough of parcell shown on GIS, no sign of work.
|